BLD-Final | 12/7/2001 | 12/7/2001 | 12/7/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 | | PASS |
Tom Arcoraci
|
|
|
wip 10/15/2001 8:46:14 AM
|
BLD-Energy code compliance | 8/14/2001 | 8/15/2001 | 8/15/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Framing/Rough-in | 8/8/2001 | 8/8/2001 | 8/8/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### c/n on site needs mec rough in ok to insulate after mec rough in 8/8/2001 2:39:33 PM
|
BLD-Framing/Rough-in | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | PART |
Tom Arcoraci
|
|
|
fire wall and shear nail insp ###-#### one hour wall ok 6/11/2001 4:00:49 AM
|
BLD-Framing/Rough-in | 5/30/2001 | 5/31/2001 | 5/31/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### 1 HOUR WALL OK 5/31/2001 2:19:02 PM
|
BLD-Foundation | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 09:19:05. Contact: ###-####.
|
BLD-Footing | 5/3/2001 | 5/4/2001 | 5/4/2001 | A | PART |
Tom Arcoraci
|
|
|
ft- ###-#### -douglas wip 5/4/2001 11:01:59 AM
|
BLD-Footing | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 16:44:12. Contact: ###-####. wip needs vert joint at footing and wall with reabar at joints 4/18/2001 1:51:28 PM
|