Permit Number | BLD01-00884 |
Status | Finaled |
Name |
IDAHO ELKS REHABILITATION HOSPITAL
|
Site Address |
600 N ROBBINS RD
|
Project Name | IDAHO ELKS REHAB |
Customer Number | |
ePlanReview | No |
Description |
(IDAHO ELK'S REHABILITATION HOSPITAL) To perform a remodel within the existing first floor Maintenance Administration & Shop Area, located in the SE Corner Area. This area is separated from the adjacent "I1.1" Hospital Treament area by an existing 2-hour Occupancy Separation wall. All 2-hour walls & rated opening / penetration protection SHALL be maintained or provided if not in place as part of this permit. The scope of this permit involves construction of interior non-combustible, fire-resistive, non-bearing, walls to create two storage rooms from one room, D1144 & D1144A, W/ new 60 minute door assembly to new storage room; new walls to create private office areas, house keeping room, maintenance shop rooms and access hall. Walls to extend from finish floor to new suspended ceiling systems above office areas & hall. No ceiling in the maintenance shop rooms. Uprade and or modify the electrical, mechanical, sprinkler and alarm systems as required to meet needs of occupants and to maintain all areas in compliance with latest adopted code of City of Boise. NOTE: This building is fully sprinklered. FIELD REVIEW, INSPECTION AND APPROVAL FOR LIFE SAFETY, SPRINKLER & ALARM SYSTEM COMPLIANCE, BY THE FIRE CODE FIELD INSPECTOR, IS REQUIRED AS A CONDITION OF THIS PERMIT. A "Letter of Completion / Compliance" is required as condition of final approval & occupancy / use of this remodeled area. PC#01-282/drs
|