To construct a 3074 sq. ft. two story single family dwelling with a 868 sq. ft. attached three car garage and 344 sq. ft. of concrete deck area with rail per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Roofs shall be constructed with Class "A" roof covering and a 30 ft. defensible area maintained around structure. (1st floor 2053 sq. ft.) (2nd floor 1021 sq. ft.) PC #267 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/4/200112/5/200112/5/2001AFAIL
DetailsTony Young
###-#### RICHARD
need house #s, and finsh pouring outside of driveway 12/5/2001 11:26:27 AM
BLD-Final12/5/200112/5/200112/5/2001PPASS
DetailsTony Young
###-#### richard 12/5/2001 11:19:16 AM
BLD-Grading Inspection12/4/200112/4/200112/4/2001 PASS
DetailsRita DeYoung
Final grading is complete and approved.
BLD-Aging Inspection10/17/200110/17/200110/17/2001 PART
DetailsTony Young
wip 10/17/2001 9:51:15 AM
BLD-Wall cover8/17/20018/17/20018/17/2001PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 08/17/2001 at 10:44:50. Contact: .
energy ok 8/17/2001 5:01:52 PM
BLD-Framing/Rough-in8/14/20018/14/20018/14/2001PPASS
DetailsTony Young
###-####
shear ok per struct. eng. verbal// c/n made ok
ok to insulate 8/14/2001 3:50:10 PM
BLD-Framing/Rough-in8/8/20018/9/20018/9/2001AFAIL
DetailsTony Young
FR -RE-INSP RICH ###-####
c/n posted, ok to side main level pending engineer approval 8/9/2001 11:06:14 AM
BLD-Framing/Rough-in8/2/20018/3/20018/3/2001ANR
DetailsRuss Owen
###-####. posted c/n needs foam seal package,needs plumbing inspection prior to a frame inspection, also left a note to remove siding for verification of shear nailing,also plans indicates nails I see no nails at any exposed osb,also attached engineering of floor straps and h-clips ,connections etc,may need the engineer to verifiy some of the requirements as plans do not show in clarity,But again no frame inspection done at this time just a general FYI. 8/3/2001 10:29:47 AM
BLD-Aging Inspection7/16/20017/16/20017/16/2001 CANC
DetailsTony Young
wip?? 7/16/2001 9:02:45 AM
BLD-Foundation5/15/20015/16/20015/16/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 05/15/2001 at 10:29:05. Contact: ###-####.
BLD-Footing5/14/20015/15/20015/15/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 05/14/2001 at 13:40:01. Contact: ###-####.wip, ok w/ verbal corrections 5/15/2001 9:19:26 AM
BLD-Foundation5/14/20015/15/20015/15/2001PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 05/14/2001 at 13:43:40. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/15/2001 at 08:52:48.