Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-00921
StatusFinaled
Name FULTON STREET ANNEX (SHELL ONLY)
Site Address 518 S 9TH ST
Project NameFULTON STREET ANNEX
Customer Number 
ePlanReviewNo
Description
(FULTON STREET ANNEX - SHELL ONLY) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To modify an existing building shell (North portion of an existing building). An interior 1-hr stair enclosure is being constructed and a seismic upgrade performed. Work is to include 1-hr walls, an interior masonry shear wall, plywood sheathing overlay on the 2nd floor and roof, through bolt tiebacks between walls and diaphragms, a partial reconstruction of the 2nd floor, and an open stairway between the 2nd floor and the 3rd level all per approved drawings, engineering, and plan review conditions on file. The 1994 UCBC was used to regulate the seismic upgrade and to define code compliance of existing historic building features. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. The South portion of this building is currently occupied by the Contemporary Theater. A non-structural demolition permit (BLD01-00993) was issued earlier. The existing fire sprinkler system shall be maintained operational. THE STRUCTURAL DESIGNS FOR THE STAIRWAYS AND THE WEST AWNING WERE APPROVED TO BE DEFERRED SUBMITTAL ITEMS. DRH99-0118, CUP99-0070, PC-0319-01 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/22/20025/23/20025/23/2002APASS
DetailsTom Arcoraci
JOHN ###-#### ok for perm occ 5/23/2002 11:01:04 AM
BLD-Final5/2/20025/3/20025/3/2002AFAIL
DetailsCarl Dependahl
john 8673334c/n, eng's & MTI affidavits needed....add rails deleted at stair as redlined ( 36" stair...both sides???) need all signatures. ok for t/o pend P&Z. 5/3/2002 3:41:42 PM
BLD-Final5/2/20025/2/20025/2/2002PNR
DetailsCarl Dependahl
###-#### john
FIRE-Final Inspection2/11/20022/12/20022/12/2002APASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 2/11/2002 2:06:56 PM
FIRE-Final Inspection2/8/20022/11/20022/11/2002ANR
DetailsRick Jackson
Scheduled by Inspector: 409 On 2/8/2002 11:17:36 AM
FIRE-Final Inspection2/8/20022/8/20022/8/2002PFAIL
DetailsRick Jackson
###-#### need knox box; sprinkler riser obstructed; need alarm and sprinkler permits passed 2/8/2002 10:25:57 AM
FIRE-Final Inspection2/8/20022/8/20022/8/2002ACANC
DetailsRick Jackson
Scheduled by Inspector: 409 On 2/8/2002 10:29:36 AM
BLD-Conference2/1/20022/4/20022/4/2002ACANC
DetailsRick Jackson
###-#### JOHN see FIRE conference notes for same date 2/4/2002 9:01:53 AM
FIRE-Conference2/4/20022/4/20022/4/2002APART
DetailsRick Jackson
Added by Inspector: 409 On 2/4/2002 9:01:28 AM with John about sprinkler heads in stairs; won't be obstructed by clouds at top of stairs
BLD-Aging Inspection1/14/20021/14/20021/16/2002 NR
DetailsCarl Dependahl
wip 1/16/2002 9:08:52 AM
BLD-Conference1/15/20021/15/20021/15/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/15/2002 5:17:43 PM w/ John re address...must be 4", posted for final
BLD-Framing/Rough-in11/14/200111/14/200111/14/2001PPART
DetailsCarl Dependahl
###-#### JOHN extend drywall membrane to seal above beam at stair "enclosure". ok to continue . 11/14/2001 3:15:37 PM
BLD-Framing/Rough-in11/5/200111/5/200111/5/2001PPART
DetailsCarl Dependahl
###-#### JOHN need spec insp reports...ok to 1side at stair enclosure, need backing between joists t lids 11/5/2001 5:20:31 PM s 11/5/2001 5:28:58 PM 11/5/2001 5:34:57 PM
BLD-Aging Inspection10/29/200110/29/200111/5/2001 NR
DetailsCarl Dependahl
wip 11/5/2001 10:27:13 AM
BLD-Framing/Rough-in8/28/20018/29/20018/29/2001APART
DetailsCarl Dependahl
###-####; joisting at ramp ok; 1: 20 slope 8/29/2001 11:49:57 AM 8/29/2001 11:50:16 AM
BLD-Framing/Rough-in8/21/20018/21/20018/21/2001PPART
DetailsCarl Dependahl
###-#### john; int framing at stairs, joisting at landing ok 8/21/2001 2:58:42 PM
BLD-Framing/Rough-in7/12/20017/13/20017/13/2001PPART
DetailsCarl Dependahl
###-####; roof diaphragm & overlay nailed off ok, wall ties and straps at roof to follow...MTI may inspect strap nailing at roof 7/13/2001 4:26:56 PM