Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-01007
StatusFinaled
Name H-P BLDG #6 (NICKEL CLEAN ROOM)
Site Address 11311 W CHINDEN BLVD
Project NameHP #6 - CLEAN ROOM
Customer Number 
ePlanReviewNo
Description
(H-P BLDG #6)(NICKEL CLEAN ROOM EXPANSION) To expand an existing fab clean room (H-6) occupancy into previously occupied office space per approved plans on file. Work to include non-combustible framing, sheetrock finish, structural upgrade at new mechanical openings between basement & main level (H-6) occupancies; installation of special chemical lines, ventilation & filtration systems, acid wash & chemical recovery systems; 1-hour occupancy separations (horizontal & vertical rated systems) between 'H-6' & other occupancies; 1-hour occupancy separation between two boiler rooms & other areas (vertical & horizontal rated systems); extension of 1-hour rated exit corridor 6-127 (rated wall & ceiling systems), to the new 1-hour exit passageway (walls floor & ceiling rated systems) on main level; installation of new exit corridor from basement through south wall; rated 1-hour protection of all support elements of the rated occupancy separations and 1-hour floor/ceiling assembly & support columns below the new exit passageway system; additional reclaim operations / equipment for Gold & Paladium; electrical, mechanical, HVAC, drainage / containment, sprinkler & alarm system upgrades for code compliance and special equipment operations, safety detection / control & production needs. To maintain or restore existing 1- hour walls & floor / ceiling systems & two hour Area Separation wall between HP Building #6-East & #6-West. To upgrade existing central east - west cooridor ceiling system to comply with code under which constructed (1994 UBC) and to construct the new corridor extension walls & ceiling to current code (1997 UBC). NOTE: This building is fully fire sprinklered. Permit BLD01-00770 issued for demolision & rated corridor extension on main level while plans for this permit were reviewed. (P.C.#0336-01)/drs 10/1/01 - DEFERRED SUBMITTAL PLANS SUBMITTED FOR CODE UPGRADE OF PH ADJUST ROOM FOR COMPLIANT 1-HOUR OCCUPANCY SEPARATION; DEMO AND RE-FINISH WITHIN THE 3/6 LINK TO CREATE THE REQUIRED 60 FOOT SEPERATION BETWEEN BUILDING 3 & 6 FOR ALLOWABLE AREA INCREASE FOR BOTH BUILDINGS. THE 60 FEET BECOMES A PEDESTRIAN WALKWAY WITH NO OCCUPANCY USE ALLOWED PER SEC. 409 UBC. MODIFICATIONS TO ALARM & SPRINKLER SYSTEMS WITHIN THE LINK REQUIRE SEPARATE, PLANS APPLICATIONS, APPROVALS AND PERMITS FROM THE FIRE CODE PLAN REVIEW DIV. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/10/20021/11/20021/11/2002APASS
DetailsTom Arcoraci
###-#### ok for perm 1/11/2002 9:32:40 AM
BLD-Final12/21/200112/27/200112/27/2001AFAIL
DetailsTom Arcoraci
Scheduled by Inspector: 407 On 12/21/2001 5:19:08 PM see 2 c/notices 12/27/2001 11:35:31 AM
BLD-Final12/19/200112/21/200112/21/2001PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/19/2001 at 11:35:33. Contact: ###-####.
BLD-Final10/24/200110/25/200110/25/2001PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/24/2001 at 11:28:14. Contact: ###-####. ok for temp occ left c/notice with contractor 10/25/2001 4:50:05 PM
FIRE-Final Inspection10/24/200110/25/200110/25/2001PPASS
DetailsTroy Cobbley
Smoke detectors relocated and fire ext. installed 10/26/2001 7:52:40 AM
BLD-Framing/Rough-in10/16/200110/16/200110/16/2001PFAIL
DetailsTom Arcoraci
###-#### DAVID doors in occ sep missing, door in cat walk missing, glass in fire doors missing, doors in steam boiler room missing, smoke seals missing at pass thru door in clean room 10/16/2001 5:12:32 PM 10/16/2001 5:13:54 PM
FIRE-Final Inspection10/12/200110/15/200110/15/2001PPASS
DetailsTroy Cobbley
OK for perm occ. Extinguishers are inplace but not perm. mounted. I will return to verify placement. 10/15/2001 2:24:01 PM
FIRE-Final Inspection10/15/200110/15/200110/15/2001PPASS
DetailsTroy Cobbley
Added by Inspector: 430 On 10/15/2001 4:45:25 PM Fire alarm system and fire sprinkler system OK for perm. occ.
BLD-Framing/Rough-in10/10/200110/12/200110/12/2001APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/10/2001 at 13:07:16. Contact: ###-####. fire stopping around piping in 1hr and 2hr walls in basement 10/12/2001 4:11:27 PM
BLD-Conference9/26/20019/27/20019/27/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/26/2001 at 16:27:11. Contact: ###-####. Walk thru.... 9/27/2001 9:49:56 AM
BLD-Framing/Rough-in9/18/20019/19/20019/19/2001APART
DetailsTom Arcoraci
###-#### clean room grid ok 9/19/2001 11:41:23 AM
BLD-Conference8/22/20018/22/20018/22/2001APASS
DetailsTom Arcoraci
Added by Inspector: 408 On 8/22/2001 10:36:28 PM wip ok
BLD-Framing/Rough-in8/13/20018/14/20018/14/2001PPART
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 8/13/2001 1:54:45 AM ed 6310245
BLD-Framing/Rough-in8/9/20018/13/20018/13/2001APART
DetailsTom Arcoraci
fr insp dave -###-#### will recall plans not on site 8/12/2001 9:54:40 PM