BLD-Final | 8/20/2001 | 8/21/2001 | 8/21/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/20/2001 at 14:55:41. Contact: ###-####. Tempered glass in place per code. C. of C. #21579 issued. 8/21/2001 8:51:16 AM
|
BLD-Final | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 13:36:31. Contact: ###-####. c/n issued--tempered glass needed in two locations. 8/17/2001 9:05:16 AM
|
BLD-Energy code compliance | 6/20/2001 | 6/22/2001 | 6/22/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/20/2001 at 16:37:01. Contact: ###-####. C/N posted on site 6/22/2001 8:34:52 AM
|
BLD-Energy code compliance | 6/22/2001 | 6/22/2001 | 6/22/2001 | P | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 6/22/2001 2:29:09 PM ok to cover--energy report was submitted. 6/22/2001 2:29:45 PM
|
BLD-Framing/Rough-in | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 18:10:35. Contact: ###-####. C/N posted-ok to insulate. 6/20/2001 11:23:19 AM
|
BLD-Other | 6/13/2001 | 6/14/2001 | 6/14/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/13/2001 at 12:00:02. Contact: ###-####. SHEAR-OK TO SIDE. 6/14/2001 10:24:10 AM
|
BLD-Other | 6/12/2001 | 6/13/2001 | 6/13/2001 | A | FAIL |
Steven Webb
|
|
|
C/N issued-missing floor to floor straps, nails needed above hd, nails not to penetrate surface of panes, etc. 6/13/2001 11:22:24 AM
|
BLD-Framing/Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 | A | NR |
Steven Webb
|
|
|
shear wall ###-#### No approved plans or address on building. 6/12/2001 9:14:20 AM
|
BLD-Foundation | 5/22/2001 | 5/22/2001 | 5/22/2001 | P | PART |
Steven Webb
|
|
|
Jose ###-#### wip 5/22/2001 1:24:25 PM
|
BLD-Footing | 5/18/2001 | 5/18/2001 | 5/18/2001 | P | PART |
Steven Webb
|
|
|
Wes ###-#### early as possible wip 5/18/2001 1:04:33 PM
|