BLD-Final | 10/31/2001 | 10/31/2001 | 10/31/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### nick ok for perm 10/31/2001 2:15:02 PM
|
BLD-Final | 10/24/2001 | 10/25/2001 | 10/25/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### nick ok but needs spec insp and eng final letters and ok from code enfor 10/25/2001 2:04:39 PM
|
BLD-Final | 10/23/2001 | 10/24/2001 | 10/24/2001 | P | CANC |
Tom Arcoraci
|
|
|
###-#### NICK
|
FIRE-Final Inspection | 10/23/2001 | 10/24/2001 | 10/24/2001 | A | PASS |
Troy Cobbley
|
|
|
OK for perm occ. 10/25/2001 8:18:46 AM
|
FIRE-Final Inspection | 9/10/2001 | 9/11/2001 | 9/11/2001 | A | PART |
Joe Tawney
|
|
|
Ok on location of three new heads at elevator shaft. Need head in bottom of shaft or info indicating non combustable hyd fluid 9/11/2001 1:19:44 PM
|
BLD-Framing/Rough-in | 8/13/2001 | 8/13/2001 | 8/13/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### jerry tie in to elevator pit wip conf 8/13/2001 1:50:55 AM
|
BLD-Foundation | 7/18/2001 | 7/19/2001 | 7/19/2001 | P | PART |
Tom Arcoraci
|
|
|
rebar nick -###-#### wip 7/19/2001 4:05:11 AM
|
BLD-Footing | 7/17/2001 | 7/17/2001 | 7/17/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/17/2001 at 08:12:05. Contact: ###-####. MTI ON SITE 7/17/2001 2:19:49 AM
|
BLD-Framing/Rough-in | 7/5/2001 | 7/5/2001 | 7/5/2001 | P | PART |
Tom Arcoraci
|
|
|
for conf on temp ramp--- nick ###-#### 7/5/2001 2:49:47 AM building ramp per plan
7/5/2001 2:50:25 AM
|