BLD-Final | 3/5/2003 | 3/6/2003 | 3/6/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/5/2003 at 9:08:39 AM. Contact: ###-####. ok for perm occ 3/6/2003 2:29:05 PM
|
Permanent Occupancy | | 3/6/2003 | 3/6/2003 | | DONE |
|
|
|
|
BLD-Final | 3/4/2003 | 3/4/2003 | 3/4/2003 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/4/2003 at 9:54:24 AM. Contact: ###-####. needs mech final 3/4/2003 4:10:46 PM
|
Code Occupancy Approval | | | 3/4/2003 | | PASS |
|
|
|
ALL DONE SO SIGNED FINAL.
|
FIRE-Final Inspection | 2/28/2003 | 2/28/2003 | 2/28/2003 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety, fire alarm and fire sprinklers finaled
|
BLD-Aging Inspection | 2/11/2003 | 2/11/2003 | 2/11/2003 | | PASS |
Tom Arcoraci
|
|
|
wip 2/11/2003 7:47:29 AM
|
Extend Permit 180 days | | 12/10/2002 | 12/10/2002 | | DONE |
|
|
|
I talk to Tom about this.
|
BLD-Aging Inspection | 12/9/2002 | 12/9/2002 | 12/9/2002 | | FAIL |
Tom Arcoraci
|
|
|
temp expired 12/9/2002 10:35:33 AM
|
BLD-Final | 8/13/2002 | 8/14/2002 | 8/14/2002 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/13/2002 at 15:45:46. Contact: ###-####.ok for temp occ entry area only 8/14/2002 11:15:38 AM
|
FIRE-Final Inspection | 8/12/2002 | 8/13/2002 | 8/13/2002 | P | PART |
Troy Cobbley
|
|
|
lobby area OK to occupy 8/13/2002 3:39:04 PM
|
FIRE-Final Inspection | 6/12/2002 | 6/14/2002 | 6/14/2002 | A | PART |
Troy Cobbley
|
|
|
Doctors office area ok to occupy 6/14/2002 2:05:33 PM
|
BLD-Conference | 6/6/2002 | 6/6/2002 | 6/6/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 6/6/2002 11:30:38 AM meet with arch after 1 pm will continue 1 hr wall and wrap beam at new const per plan 6/6/2002 2:28:13 PM
|
BLD-Conference | 5/20/2002 | 5/20/2002 | 5/20/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 5/20/2002 8:27:22 AM
|
BLD-Conference | 5/16/2002 | 5/17/2002 | 5/17/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 5/16/2002 4:58:35 PM struc members need 1 hr protection 5/20/2002 7:40:47 AM
|
BLD-Wall cover | 5/16/2002 | 5/16/2002 | 5/16/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### jan ok to cover phase 3. new entry struc members need 1 hr protection 5/16/2002 4:25:58 PM
|
FIRE-Final Inspection | 5/2/2002 | 5/3/2002 | 5/3/2002 | P | PART |
Troy Cobbley
|
|
|
group/rec room ok for occupancy 5/3/2002 3:55:58 PM
|
FIRE-Final Inspection | 4/26/2002 | 4/29/2002 | 4/29/2002 | A | PART |
Troy Cobbley
|
|
|
nurses station area OK of occ 4/29/2002 4:36:58 PM
|
BLD-Framing/Rough-in | 4/26/2002 | 4/26/2002 | 4/26/2002 | P | PART |
Tom Arcoraci
|
|
|
ok to cover jan ###-#### ok to cover 2 hr wall in group rec room 4/26/2002 12:00:37 PM
|
FIRE-Final Inspection | 4/25/2002 | 4/26/2002 | 4/26/2002 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was for the nurse station area. Earthquake straps are missing from the new and existing fire sprinkler pipe hangers and notification circuit for this area was not working 4/26/2002 4:10:01 PM
|
FIRE-Final Inspection | 4/4/2002 | 4/5/2002 | 4/5/2002 | P | PART |
Troy Cobbley
|
|
|
Classroom area is ok to occupy. Penatrations through corridor wall repair work needs to be verified with manufactures installation sheets 4/5/2002 4:14:50 PM
|
FIRE-Final Inspection | 4/1/2002 | 4/2/2002 | 4/2/2002 | P | FAIL |
Troy Cobbley
|
|
|
This inspection was for the classroom. No fire sprinkler plans on site, need to add duct detectors to hvac unit, provide fire sprinkler canopies, add fire extinguisher, repair penatrations though 2-hour wall, test fire alarm system 4/2/2002 4:39:22 PM
|
FIRE-Final Inspection | 3/27/2002 | 3/28/2002 | 3/28/2002 | P | FAIL |
Rick Jackson
|
|
|
###-#### JAN wanted to occupy the group room; sprinklers within 6 feet of each other, need to test the smoke detector and notification within the group room/bathroom 3/28/2002 4:18:08 PM
|
FIRE-Conference | 3/27/2002 | 3/27/2002 | 3/27/2002 | P | CANC |
Troy Cobbley
|
|
|
###-#### JAN
|
BLD-Other | 3/5/2002 | 3/6/2002 | 3/6/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 11:49:08. Contact: ###-####. ceiling grid in new nurses station 3/6/2002 1:00:00 PM
|
BLD-Final | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### JAN Complete 2hr wall. 3/5/2002 12:05:39 PM
|
BLD-Framing/Rough-in | 1/30/2002 | 1/31/2002 | 1/31/2002 | A | PART |
Tom Arcoraci
|
|
|
ok to cover--jan-- ###-#### ok to cover nurse sta 1/31/2002 11:05:15 AM
|
BLD-Wall cover | 1/3/2002 | 1/3/2002 | 1/3/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-#### ok to cover class room 1/3/2002 3:31:51 PM
|
BLD-Framing/Rough-in | 12/19/2001 | 12/20/2001 | 12/20/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### ok to cover ext at front entry 12/20/2001 4:06:49 PM
|
BLD-Framing/Rough-in | 11/27/2001 | 11/28/2001 | 11/28/2001 | P | PART |
Russ Owen
|
|
|
jan ###-#### wall. ext walls of class room. 11/28/2001 4:43:45 PM
|
BLD-Conference | 11/20/2001 | 11/20/2001 | 11/20/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### JAN need detail for attachment of flat studs to angle hold down 11/20/2001 3:11:34 PM
|
BLD-Concrete | 11/1/2001 | 11/2/2001 | 11/2/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### JAN pending spec insp 11/1/2001 3:32:38 PM
|
BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### JAN wip ok 10/15/2001 1:41:35 PM
|
BLD-Foundation | 9/13/2001 | 9/14/2001 | 9/14/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/13/2001 at 12:21:39. Contact: ###-####.subject to s-i. 9/14/2001 12:03:47 PM
|
BLD-Framing/Rough-in | 9/11/2001 | 9/12/2001 | 9/12/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 16:18:03. Contact: ###-####.
|
BLD-Footing | 9/4/2001 | 9/5/2001 | 9/5/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### JAN wip spec on site 9/5/2001 3:18:17 AM
|