Permit Information
Permit NumberBLD01-01167
StatusFinaled
Name HEATON CONSTRUCTION COMPANY
Site Address 368 W SHERMAN ST
Project NameHILLSIDE
Customer Number 
ePlanReviewNo
Description
To construct a 2072 sq. ft. two story single family dwelling with a 450 sq. ft. finished basement, a 765 sq. ft. attached two car garage/shop/storage area, a 108 sq. ft. covered entry way at lower level and a 340 sq. ft. trex deck off main level per approved plans, all engineering/red-lining and attached requirement lists. Note: This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and defensible space will be maintained. (1st floor 1457 sq. ft.)(2nd floor 615 sq. ft.) PC #341 DJO Note: Garage and basement area have been increased. 80 sq. ft. to garage and 210 sq. ft. in basement (crawler area to basement). No additional fees.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/21/20023/21/20023/21/2002PPASS
DetailsTony Young
###-#### RICH
needs to post bond, then office can give c of c 3/21/2002 2:49:06 PM
BLD-Grading Inspection3/21/20023/21/20023/21/2002 BOND
DetailsRita DeYoung
Grading is complete. Reveg is not. Engineer is recommending $400 bond for reveg. Upon receipt of this bond the grading and drainage is conditionally approved.
BLD-Final3/14/20023/15/20023/15/2002ANR
DetailsTony Young
###-####
BLD-Final3/15/20023/15/20023/15/2002PFAIL
DetailsTony Young
890----9730 call 1 st 3/15/2002 10:29:02 AM
BLD-Aging Inspection1/21/20021/21/20021/21/2002 PART
DetailsTony Young
BLD-Framing/Rough-in11/19/200111/20/200111/20/2001PFAIL
DetailsTony Young
###-#### RICH
finish hd,s and put insulation back in place 11/20/2001 4:09:09 PM
BLD-Framing/Rough-in11/6/200111/8/200111/8/2001ANR
DetailsCarl Dependahl
###-####, complete hd's, recall 11/8/2001 9:55:16 AM
BLD-Framing/Rough-in11/8/200111/8/200111/8/2001PFAIL
DetailsTony Young
###-####
still not ready 11/8/2001 1:49:03 PM
BLD-Framing/Rough-in11/1/200111/2/200111/2/2001AFAIL
DetailsSteven Webb
late am ###-#### c/n prior c/n items not completed. Complete all items and re-call. 11/2/2001 11:24:01 AM
BLD-Framing/Rough-in10/29/200110/30/200110/30/2001PPART
DetailsTony Young
fr insp- rich ###-####
c/n posted, ok to insulate pending pressure test pass, and engineer approval letter 10/30/2001 3:26:48 PM
BLD-Framing/Rough-in9/26/20019/26/20019/26/2001PFAIL
DetailsTom Arcoraci
###-#### CN POSTED ENGINEER TO MAKE FIELD INSP AND OK ENGINEERED SYSTEMS 9/26/2001 2:50:28 PM
BLD-Conference8/14/20018/15/20018/15/2001APART
DetailsTony Young
###-#### rich please call before
winder stair issues,. will go back w/ handout 8/15/2001 10:20:29 AM
BLD-Conference8/15/20018/15/20018/15/2001PPASS
DetailsTony Young
stair issues 8/15/2001 10:23:24 AM
gave papers on stairs, also talked about blocking trusses per architect, ok to change detail w/ arch. approval 8/15/2001 4:06:41 PM
BLD-Foundation7/2/20017/3/20017/3/2001APART
DetailsTony Young
###-####
pouring 7/3/2001 11:14:47 AM
BLD-Footing6/22/20016/25/20016/25/2001PPART
DetailsTony Young
early pm Rich ###-####
c/n, ok to pour after fixes are done, verbal ok via phone 6/26/2001 10:50:10 AM