Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-01238
StatusFinaled
Name WESTERN POWER SPORTS
Site Address 601 W GOWEN RD
Project NameWESTERN POWER SPORTS
Customer Number 
ePlanReviewNo
Description
(WESTERN POWER SPORTS) New tenant in 106,964 sq. ft. shell building done under BLD01-00197 for warehouse storage, office, and assembly use. The main floor has 80,482 sq. ft. and the mezzanine level has 26,482 sq. ft. Work to include new accessible restrooms and shower rooms, new interior walls, new interior doors and windows, interior finish, new suspended ceiling installation, smoke/heat vents and curtain board installations, fire sprinkler work, fire alarm work, new mechanical work, new plumbing work, and new electrical work. Assembly (A-3) basketball court and assembly (A-3) break room are located on the mezzanine level and shall be supported by not less than one-hour fire resistive construction. (A spray-applied fire-resistive system will be used.) Racking system in the warehouse will be done under a separate permit. (BLD01-01592) A Certificate of Occupancy is to be issued for this tenant when work is completed and approved. NOTE: This building is fully fire sprinklered for area increase and has 60' minimum setbacks on all sides for unlimited area. (P.C.#0408-01) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/2/200110/3/200110/3/2001APASS
DetailsJim Storey
greg ###-#### final ok per approved plan. 10/3/2001 9:28:17 AM
Permanent Occupancy 10/3/200110/3/2001 DONE
Details
BLD-Final9/7/20019/7/20019/7/2001PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/07/2001 at 07:30:39. Contact: ###-####. handrail ar dock / auto flush bolt at cof.rm./saftey glazing 2 locations at office/main door sign. 9/10/2001 9:24:53 AM
FIRE-Final Inspection9/6/20019/7/20019/7/2001PPASS
DetailsRick Jackson
###-#### greg
BLD-Final8/26/20018/27/20018/27/2001PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/26/2001 at 08:44:55. Contact: ###-####.
FIRE-Final Inspection8/26/20018/27/20018/27/2001PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/26/2001 at 08:44:12. Contact: ###-####. not ready for TI 8/28/2001 7:10:10 AM
BLD-Wall cover8/22/20018/23/20018/23/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/22/2001 at 13:05:18. Contact: ###-####.called pat, he wanted to know if 2nd floor ceiling had been approved ,looks like 420 okd. 8/23/2001 10:44:41 AM
BLD-Wall cover8/22/20018/22/20018/22/2001PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 08/22/2001 at 08:46:11. Contact: ###-####. ok to cover acc. ceiling pending electrical ok in 2nd floor area break, reading, etc. areas. 8/22/2001 1:00:52 PM
BLD-Wall cover8/1/20018/2/20018/2/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/01/2001 at 12:46:43. Contact: ###-####. fire stopping ok prvious cn area. 8/2/2001 11:01:24 AM
BLD-Wall cover7/27/20017/27/20017/27/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/27/2001 at 08:37:42. Contact: ###-####. 2nd floor ok to cover all but com. chase maintane occ wall. 7/27/2001 12:37:35 PM
BLD-Framing/Rough-in7/25/20017/25/20017/25/2001PPART
DetailsJim Storey
Greg ###-#### c/n ok to one side pending plm. 7/25/2001 2:13:03 PM
BLD-Framing/Rough-in7/23/20017/23/20017/23/2001PCANC
DetailsJim Storey
2nd floor framing ###-#### cancelled no plumbing scheduled
BLD-Wall cover7/10/20017/11/20017/11/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/10/2001 at 09:35:10. Contact: ###-####.