BLD-Final | 3/29/2002 | 4/2/2002 | 4/2/2002 | A | PASS |
Jim Storey
|
|
|
###-#### bryan final ok pending p&z sign off. 4/2/2002 8:48:19 AM
|
BLD-Final | 2/11/2002 | 2/12/2002 | 2/12/2002 | A | PART |
Jim Storey
|
|
|
JIM ###-#### temp ok need reinsp. for basement col. and can light in closet. 2/12/2002 10:09:12 AM
|
BLD-Final | 2/6/2002 | 2/7/2002 | 2/7/2002 | P | CANC |
Jim Storey
|
|
|
FN JIM ###-####
|
FIRE-Final Inspection | 2/5/2002 | 2/6/2002 | 2/6/2002 | P | PASS |
Rick Jackson
|
|
|
###-####
|
FIRE-Final Inspection | 1/30/2002 | 1/31/2002 | 1/31/2002 | P | FAIL |
Rick Jackson
|
|
|
###-#### firestopping; dampers need L brackets; exit sign second floor 1/31/2002 4:58:59 PM
|
BLD-Framing/Rough-in | 1/17/2002 | 1/17/2002 | 1/17/2002 | P | CANC |
Jim Storey
|
|
|
t-bar insp --jim ###-####
|
BLD-Wall cover | 12/18/2001 | 12/19/2001 | 12/19/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/18/2001 at 13:44:03. Contact: ###-####. duct work ok. 12/19/2001 11:50:55 AM
|
BLD-Framing/Rough-in | 12/11/2001 | 12/11/2001 | 12/11/2001 | P | PASS |
Jim Storey
|
|
|
###-#### framing ok shaft pending assemblie. 12/12/2001 9:30:57 AM
|
BLD-Framing/Rough-in | 12/7/2001 | 12/10/2001 | 12/10/2001 | A | NR |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 12/6/2001 | 12/7/2001 | 12/7/2001 | A | PART |
Jim Storey
|
|
|
AARON ###-#### need to finsh hd atchments. 12/7/2001 4:39:20 PM
|
BLD-Framing/Rough-in | 12/6/2001 | 12/6/2001 | 12/6/2001 | P | NR |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 11/30/2001 | 11/30/2001 | 11/30/2001 | P | PART |
Jim Storey
|
|
|
###-#### exterior nailling ok for cover. 11/30/2001 4:27:55 PM
|
BLD-Conference | 11/28/2001 | 11/28/2001 | 11/28/2001 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/28/2001 at 09:59:05. Contact: ###-####. talked about doors and windows in demizing walls and hvac chase 11/28/2001 3:59:51 PM
|
BLD-Framing/Rough-in | 11/26/2001 | 11/27/2001 | 11/27/2001 | A | PART |
Jim Storey
|
|
|
###-#### erin roof nailling ok 11/27/2001 12:28:14 PM
|
BLD-Framing/Rough-in | 11/27/2001 | 11/27/2001 | 11/27/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/27/2001 at 08:39:20. Contact: ###-####. roof nailling ok pending hard copy from engineer to back up verbal discution. 11/27/2001 1:57:46 PM
|
BLD-Framing/Rough-in | 11/21/2001 | 11/26/2001 | 11/26/2001 | P | NR |
Jim Storey
|
|
|
AARON ###-####
|
BLD-Foundation | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | PART |
Jim Storey
|
|
|
###-#### west an south 24 '' walls ok 10/19/2001 3:03:30 PM
|
BLD-Foundation | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### BRYAN
|
BLD-Footing | 9/25/2001 | 9/26/2001 | 9/26/2001 | P | PART |
Jim Storey
|
|
|
###-#### placed w/o insp. appears ok/ pending insp. report. 9/26/2001 5:12:13 PM
|