BLD-Final | 4/18/2002 | 4/18/2002 | 4/18/2002 | | DONE |
|
|
|
Final/ok for L.C. for the shell
|
BLD-Final | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | NR |
Jim Storey
|
|
|
###-#### HAROLD need mech permit sign off. 3/15/2002 1:51:47 PM
|
FIRE-Final Inspection | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 3/14/2002 4:43:42 PM
|
BLD-Final | 1/4/2002 | 1/7/2002 | 1/7/2002 | P | PART |
Jim Storey
|
|
|
###-#### temp ok with agrement w/d.miller 1/7/2002 1:57:25 PM
|
BLD-Final | 1/4/2002 | 1/7/2002 | 1/7/2002 | P | PART |
Jim Storey
|
|
|
###-#### temp ok with agrement w/d.miller 1/7/2002 1:57:25 PM
|
FIRE-Final Inspection | 1/4/2002 | 1/7/2002 | 1/7/2002 | A | PART |
Rick Jackson
|
|
|
###-#### per Dave Miller temp occ approved pending resolution of alarm system 1/7/2002 9:32:54 AM
|
BLD-Conference | 10/23/2001 | 10/23/2001 | 10/23/2001 | A | FAIL |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 10/23/2001 8:56:19 AM need test on exterior rain water piping
|
BLD-Foundation | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | PASS |
Jim Storey
|
|
|
###-#### west ft and pannel rebar ok pending special insp report/ resubmital need archived at next insp. w/harold. 9/20/2001 8:09:20 AM
|
BLD-Footing | 8/13/2001 | 8/14/2001 | 8/14/2001 | P | PART |
Dave Hannah
|
|
|
###-#### harold spec inspection on site will check panels and ftg 8/14/2001 3:04:55 PM
|
FIRE-Sprinkler Rough-in | 8/13/2001 | 8/13/2001 | 8/13/2001 | A | PART |
Rick Jackson
|
|
|
###-#### brad okay to cover supply line see FIR01-00442 for proper permit of underground 8/13/2001 10:09:35 AM
|