BLD-Final | 8/13/2001 | 8/14/2001 | 8/14/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 14:11:01. Contact: ###-####.ok perm oc. 8/14/2001 3:27:43 PM
|
Permanent Occupancy | | 8/14/2001 | 8/14/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/13/2001 | 8/13/2001 | 8/13/2001 | P | PASS |
Joe Tawney
|
|
|
Final OK for permanant occupancy 8/13/2001 2:01:43 PM
|
BLD-Other | 7/27/2001 | 7/30/2001 | 7/30/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 16:49:30. Contact: ###-####.ceiling grid. 7/30/2001 10:27:23 AM
|
BLD-Other | 7/27/2001 | 7/27/2001 | 7/27/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 09:22:28. Contact: ###-####.needs 3 pods in rooms over 144sq ft and light wires tied in far left office west side and all vertical pods in place now need the 4 way wire bracing installed. 7/27/2001 3:48:20 PM
|
BLD-Framing/Rough-in | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 11:03:44. Contact: ###-####.ok to start rock. 7/11/2001 4:27:59 PM
|
BLD-Framing/Rough-in | 7/10/2001 | 7/10/2001 | 7/10/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 08:17:23. Contact: ###-####. need elect,plumbing approvred,ok to rock 1 side, recall when ready. No c/n talked with JC. 7/10/2001 1:58:05 PM
|