BLD-Final | 12/6/2001 | 12/7/2001 | 12/7/2001 | P | PASS |
Carl Dependahl
|
|
|
david ###-#### bsmt only 12/7/2001 4:06:30 PM
|
BLD-Final | 12/6/2001 | 12/7/2001 | 12/7/2001 | A | CANC |
Carl Dependahl
|
|
|
david ###-####
|
Permanent Occupancy | | 12/7/2001 | 12/7/2001 | | DONE |
|
|
|
|
BLD-Final | 10/26/2001 | 10/29/2001 | 10/29/2001 | A | PART |
Russ Owen
|
|
|
###-#### DAVID. Appears all required signatures are on card , Mechanical has been finaled, need to know what 340 wanted else wise may need to lower restroom mirrors to 40 In. Will wait for 340 to return to work, Spoke with Dave at site. 10/29/2001 1:05:00 PM
|
BLD-Aging Inspection | 10/2/2001 | 10/2/2001 | 10/5/2001 | | NR |
Carl Dependahl
|
|
|
met owner at site 10/5/2001 11:43:08 AM
|
BLD-Conference | 10/4/2001 | 10/4/2001 | 10/4/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/4/2001 3:54:05 PM w/OWNER re final status, will obtain all signatures
|
BLD-Conference | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/2/2001 3:00:38 PM re obtaining final
|
BLD-Final | 8/2/2001 | 8/2/2001 | 8/2/2001 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 10:12:11. Contact: ###-####.c/n, base/wall finishes, ADA mirrors at restrms; clarify deletions/modifications; obtain all perm finals, etc. OK for t/o, card to contractor. 8/3/2001 2:39:02 PM
|
BLD-Other | 8/2/2001 | 8/2/2001 | 8/2/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 10:15:10. Contact: ###-####...conf. w/ bldr 8/2/2001 5:39:02 PM
|
FIRE-Final Inspection | 8/1/2001 | 8/1/2001 | 8/1/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 09:14:22. Contact: . 8/1/2001 1:33:16 PM
|
FIRE-Final Inspection | 7/24/2001 | 7/24/2001 | 7/24/2001 | P | FAIL |
Rick Jackson
|
|
|
Added by Inspector: 409 On 7/24/2001 3:40:25 PM plywood walls; emergency lighting; exit signs and alarm problems
|
BLD-Other | 7/16/2001 | 7/16/2001 | 7/16/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 09:31:56. Contact: ###-####. conf need others to sign off. 7/16/2001 4:11:33 PM
|
BLD-Conference | 7/2/2001 | 7/2/2001 | 7/2/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/2/2001 1:45:34 PM w/ owner need other finals 1st
|
BLD-Final | 6/29/2001 | 7/2/2001 | 7/2/2001 | A | NR |
Russ Owen
|
|
|
terry ###-####
|
BLD-Conference | 6/29/2001 | 6/29/2001 | 6/29/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/29/2001 2:18:00 PM w/ owner & contractor....need fire ok prior to struct. ok
|
BLD-Conference | 6/26/2001 | 6/26/2001 | 6/26/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/26/2001 9:23:07 AM w/ 337....need Musgrove's letter re hvac design, consult w/ Westfall.
|
BLD-Conference | 6/26/2001 | 6/26/2001 | 6/26/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/26/2001 at 08:19:34. Contact: ###-####. w/ owner & bldr....keep c/n; install fire dampers at r/a chase at bsmt lid as per 337....ok to mitigate nr, non-ducted r/a "shaft" 6/26/2001 3:06:05 PM
|
FIRE-Conference | 6/26/2001 | 6/26/2001 | 6/26/2001 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/26/2001 at 08:21:03. Contact: ###-####. exit requirement; exit signs and emergency lights; extinguishers, etc. 6/26/2001 2:23:29 PM
|
BLD-Framing/Rough-in | 6/21/2001 | 6/21/2001 | 6/21/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/21/2001 at 08:56:58. Contact: . ok to cover lids & over stage; need consult re hvac 6/21/2001 1:31:13 PM
|
BLD-Framing/Rough-in | 6/20/2001 | 6/20/2001 | 6/20/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-####; c/n, masonry lintels, fireblocks, hvac?? 6/20/2001 4:56:34 PM
|