BLD-Final | 5/9/2002 | 5/10/2002 | 5/10/2002 | A | PASS |
Jim Sly
|
|
|
tim- ###-#### fn OK for Perm. Occ. 5/10/2002 12:35:11 PM
|
BLD-Final | 4/11/2002 | 4/12/2002 | 4/12/2002 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/11/2002 at 14:01:26. Contact: ###-####. OK for Temp Occ. C/N....Obtain perm occ status within 90 days of this notice. 4/12/2002 11:34:09 AM
|
FIRE-Final Inspection | 3/25/2002 | 3/25/2002 | 3/25/2002 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 3/25/2002 12:01:14 PM fire life/safety finaled
|
BLD-Framing/Rough-in | 12/13/2001 | 12/13/2001 | 12/13/2001 | P | PASS |
Jim Sly
|
|
|
Added by Inspector: 316 On 12/13/2001 12:01:13 PM frame OK for shell.
|
BLD-Framing/Rough-in | 11/26/2001 | 11/26/2001 | 11/26/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/26/2001 at 10:25:21. Contact: ###-####. Roof nailing OK. 11/26/2001 3:14:46 PM
|
BLD-Foundation | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | PASS |
Jim Sly
|
|
|
###-#### AFTER BEEP 14236 CLINT
|
BLD-Footing | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | PASS |
Dave Hannah
|
|
|
CLINT ###-#### AFTER BEEP 14236
|