Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-01386
StatusFinaled
Name MAGNUSON DWIGHT R
Site Address 2933 W HILLWAY DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To remodel and construct a addition to a existing single family residence. 86 sq. ft. to be added to the first floor with a new entry and a stairway to the second floor. 1036 sq. ft. second floor addition to be constructed. There will be two bedrooms, one and half bathrooms and a family room in the new upstairs. There will be a 365 sq. ft. attached one car garage constructed in the place of the existing carport/garage. The existing structure in this area will be demolished. There will also be a 48 sq. ft. deck constructed off the master bedroom. Per approved plans, engineering, requirement list and all red-lining. Battery powered smoke detectors required per code in existing residence. Terry Records with Public Works signed off (grade less than 15% does not require hillside engineering. Roger Jones with Planning and Zoning approved. (sam)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/19/200112/20/200112/20/2001APASS
DetailsTony Young
###-#### ###-####
c of c issued, pending final affidavit letter from s. i. co. MTI 12/20/2001 10:46:48 AM
BLD-Final12/12/200112/17/200112/17/2001ANR
DetailsRuss Owen
###-####. called contractor no guardrail or hand rail at ext deck also no mechanical final. did not go in house as this is not ready. 12/17/2001 11:11:42 AM
BLD-Framing/Rough-in11/30/200112/3/200112/3/2001ANR
DetailsTony Young
fr insp richard ###-####
BLD-Energy code compliance10/4/200110/4/200110/4/2001PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 10/04/2001 at 10:28:01. Contact: ###-####.
BLD-Energy code compliance10/3/200110/3/200110/3/2001PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 10/03/2001 at 11:17:22. Contact: ###-####.
BLD-Framing/Rough-in9/27/20019/28/20019/28/2001APASS
DetailsTony Young
shane 9/27/2001 5:08:44 PM
BLD-Framing/Rough-in9/28/20019/28/20019/28/2001PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 09/28/2001 at 10:41:48. Contact: ###-####.
BLD-Framing/Rough-in9/27/20019/27/20019/27/2001PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 09/27/2001 at 08:04:23. Contact: ###-####.
BLD-Other9/17/20019/17/20019/17/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 09/17/2001 at 10:37:58. Contact: ###-####.shear ok except on west and south walls 9/17/2001 4:49:47 PM
BLD-Framing/Rough-in9/7/20019/7/20019/7/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 09/07/2001 at 10:46:54. Contact: ###-####.conf. only on framing, no formal inspection made , no approval for ANY cover. 9/7/2001 2:04:20 PM
BLD-Framing/Rough-in7/9/20017/10/20017/10/2001APART
DetailsTony Young
flooring 7/9/2001 2:40:22 PM
front part of floor area 7/10/2001 10:30:34 AM
BLD-Framing/Rough-in7/10/20017/10/20017/10/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 07/10/2001 at 09:02:49. Contact: ###-####.same flooring, joists 7/10/2001 2:03:39 PM
BLD-Conference7/9/20017/9/20017/9/2001PDONE
DetailsTony Young
Scheduled by Inspector: 415 On 7/9/2001 2:32:27 PM phone call, ok to start sheeting floor, leave part open to see, must be per approved plans. 7/9/2001 2:40:00 PM
BLD-Footing6/26/20016/27/20016/27/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 06/26/2001 at 17:34:14. Contact: ###-####.
wip 6/27/2001 2:52:17 PM
BLD-Footing6/21/20016/22/20016/22/2001ANR
DetailsTony Young
early am 6/21/2001 1:40:08 PM
BLD-Footing6/20/20016/21/20016/21/2001PNR
DetailsTony Young
###-####