BLD-Final | 9/23/2002 | 9/24/2002 | 9/24/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/23/2002 at 11:54:12. Contact: ###-####. shell is complet ok to doc final 9/23/2002 2:39:25 PM
|
BLD-Final | 9/16/2002 | 9/17/2002 | 9/17/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/16/2002 at 14:33:45. Contact: ###-####.needs to finish 1 hr wall around mec room area in soffit have letters from engineer and mti approving project 9/17/2002 10:47:34 AM
|
BLD-Final | 9/12/2002 | 9/12/2002 | 9/12/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/12/2002 at 09:08:31. Contact: ###-####....need spec insp summary report, eng's ok,..other signature's 9/12/2002 1:26:51 PM
|
FIRE-Final Inspection | 9/11/2002 | 9/12/2002 | 9/12/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/11/2002 at 16:50:02. Contact: ###-####.
|
FIRE-Final Inspection | 6/20/2002 | 6/21/2002 | 6/21/2002 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 6/20/2002 11:07:42 AM curbing for fire lanes; alarm account active; ball drip for sprinkler FDC to outside; complete one hour riser room; keys for knox box; sign on door to riser room indicating sprinkler controls and FACP 6/21/2002 3:55:48 PM
|
FIRE-Final Inspection | 6/19/2002 | 6/20/2002 | 6/20/2002 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/19/2002 at 13:17:46. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/6/2001 | 12/6/2001 | 12/6/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/6/2001 11:44:08 AM gen'l walk-thru for shell only...need eng's/spec. insp reports & affidavits.
|
BLD-Aging Inspection | 12/5/2001 | 12/5/2001 | 12/5/2001 | | NR |
Carl Dependahl
|
|
|
wip 12/6/2001 11:44:40 AM
|
BLD-Framing/Rough-in | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/04/2001 at 13:20:20. Contact: ###-####. ok to cover ext parapet const only 10/5/2001 11:45:22 AM
|
BLD-Concrete | 8/22/2001 | 8/23/2001 | 8/23/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 14:45:48. Contact: ###-####...ok w/ si report pending. 8/23/2001 9:25:15 AM
|
BLD-Concrete | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | PART |
Carl Dependahl
|
|
|
Bob ###-#### panels look good, pending insp report 8/14/2001 4:02:10 PM
|
BLD-Foundation | 8/13/2001 | 8/13/2001 | 8/13/2001 | P | PART |
Carl Dependahl
|
|
|
tilt wall foundation bob ###-#### 8/13/2001 2:34:31 PM pend spec. insp report 8/13/2001 2:43:03 PM
|
BLD-Concrete | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/7/2001 3:32:15 PM wall panels, pend report
|
BLD-Footing | 8/2/2001 | 8/2/2001 | 8/2/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 10:29:40. Contact: ###-####...panels ok pend spec insp report 8/2/2001 3:54:03 PM
|
BLD-Footing | 7/19/2001 | 7/19/2001 | 7/19/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/19/2001 at 08:12:08. Contact: ###-####. pad footings ok special insp on site scope of work to be supplied at next insp. 7/19/2001 1:28:39 PM
|