Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-01538
StatusFinaled
Name SCHINDLER ELEVATOR CORP
Site Address 743 W MCGREGOR CT Unit: 140
Project NameFEDERAL WAY COMMERCE
Customer Number 
ePlanReviewNo
Description
(SCHINDLER ELEVATOR CORP)(FEDERAL WALL COMMERCE-BLDG #2) To construct a 8,817 sq.ft. office/storage/fabrication tenant space per approved plans on file. 1st floor = 5,825 sq.ft./second floor = 2,992 sq.ft. Work to include, construction of interior partitions for office spaces, breakroom, conference room, and warehouse area, construction of two accessible restrooms, construction of second floor for storage area, construction to be TJI open web joists bearing on ledger attached to existing concrete tilt-up walls, and interior 2x8 wood stud walls with thickened footing, and bearing on 2x6 wood stud tenant demising wall no footing required under 2x6 wall, New plumbing, electrical, and mechanical work. NOTE: This building is fully fire sprinklered for area increase. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. (P.C.#0477-01)*RmH*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/20/20019/24/20019/24/2001PPASS
DetailsJim Storey
###-#### call first final ok storage below 8 ft. 9/24/2001 1:24:40 PM
FIRE-Final Inspection9/21/20019/24/20019/24/2001APASS
DetailsRick Jackson
fire gene- ###-####
Permanent Occupancy 9/24/20019/24/2001 DONE
Details
FIRE-Final Inspection9/20/20019/21/20019/21/2001AFAIL
DetailsJoe Tawney
Reinsp Fail duct detectors would not trip on can n ed smoke. FIR01-00419 9/21/2001 10:43:39 AM 9/21/2001 10:44:15 AM
BLD-Final9/17/20019/17/20019/17/2001PPASS
DetailsJim Storey
###-#### call first
tmp occ ok pending fire alarm reinsp. engineering recived to make c/n approved on framing.archived to plan.temp ok. 9/18/2001 11:15:44 AM
BLD-Final9/12/20019/13/20019/13/2001AFAIL
DetailsDave Hannah
###-#### call first c/n on site they premits for racking sytem no temp occ issued until racks are permited 9/13/2001 10:06:42 AM
FIRE-Final Inspection9/12/20019/13/20019/13/2001APART
DetailsRick Jackson
###-#### call first temp approved per Dave Miller and completion of duct detectors to alarm panel and approval of plans; high pile storage racks installed without plans. talked to rep of schindler and he said they will be submitted as soon as possible 9/13/2001 9:11:28 AM
BLD-Framing/Rough-in8/22/20018/23/20018/23/2001APASS
DetailsRuss Owen
jean ###-#### call first ceiling grid
BLD-Framing/Rough-in7/31/20017/31/20017/31/2001PPART
DetailsRuss Owen
###-#### call first to meet. ok to complete all interior shear walls etc,need ok for 3/4" substitution of 1" bolts for ledgers,cont will provide ok from engineer.also stairs not yet constructed. 7/31/2001 3:54:29 PM