Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-01556
StatusFinaled
Name ZION'S BANK
Site Address 890 W MAIN ST
Project NameALEXANDER BLDG
Customer Number 
ePlanReviewNo
Description
(ZION'S BANK) This building is fire sprinklered for story increase. To remodel areas on the 1st floor (2,395 square feet), 2nd floor (1,150 square feet), and 3rd floor (2,590 square feet) of an existing historic building for a new bank/office tenant. Work is to include interior nonbearing walls, interior doors, millwork, structural support for a new safe, an ATM, a marquee, and interior finishes all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13 as regulated by the Fire Department. A PERMIT FROM ACHD'S CONSTRUCTION DIVISION FOR THE INSTALLATION OF THE STORM DRAIN PIPE AND CONNECTION TO THE TREE WELL IS REQUIRED. VERIFICATION OF A TEMPORARY LICENSE AGREEMENT FROM ACHD TO ALLOW THE MARQUEE AND STORM DRAIN IN THE PUBLIC RIGHT OF WAY IS REQUIRED PRIOR TO OCCUPANCY. PC-0480-01 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/29/20024/30/20024/30/2002APASS
DetailsTom Arcoraci
###-#### DAVE ok for perm occ 4/30/2002 11:12:12 AM
Permanent Occupancy 4/30/20024/30/2002 DONE
Details
FIRE-Final Inspection4/29/20024/29/20024/29/2002PPASS
DetailsRick Jackson
###-#### DAVE
BLD-Aging Inspection1/21/20021/21/20021/23/2002 NR
DetailsCarl Dependahl
zions bank; complete fire "agreement " items 1/23/2002 6:23:03 PM
BLD-Aging Inspection11/19/200111/19/200111/26/2001 NR
DetailsCarl Dependahl
called bldr, left msg, consulted w/ 409 re FACP upgrade agreement. keep c/n wip 11/26/2001 11:44:06 AM
BLD-Final9/19/20019/19/20019/19/2001PFAIL
DetailsCarl Dependahl
###-####, c/n, fire alarm agreement to be in place, seal floor & shaft penetrations, etc. 9/19/2001 5:56:40 PM
FIRE-Final Inspection9/19/20019/19/20019/19/2001PPART
DetailsRick Jackson
fire fn- terry ###-#### per agreement with Dave Miller the FACP will be upgraded to handle the AHU detectors; smoke fire damper operation; sprinkler monitoring and other items to comply with code 9/19/2001 4:23:08 PM
FIRE-Final Inspection9/17/20019/18/20019/18/2001PFAIL
DetailsRick Jackson
TERRY ###-#### AHU detector not wired; need approval from Dave Miller for temp 9/18/2001 5:29:51 PM
FIRE-Final Inspection9/17/20019/17/20019/17/2001PNR
DetailsRick Jackson
fire fn terry-- ###-####
BLD-Framing/Rough-in9/12/20019/12/20019/12/2001PPART
DetailsCarl Dependahl
fire walls dave ###-#### shaft thru 2nd fl ok per detail. 9/12/2001 3:52:28 PM ok to cover vert & horiz. portion of shaft 9/12/2001 3:53:11 PM
BLD-Conference9/11/20019/11/20019/11/2001PPASS
DetailsCarl Dependahl
dave- ###-#### for conf ...rec'd detail; added clarifications to sheet & approved. 9/11/2001 1:43:52 PM
BLD-Framing/Rough-in9/11/20019/11/20019/11/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 9/11/2001 1:46:15 PM need install int layers gyp at horiz. shaft; infill 1st floor openings & seal "shaft" & verify s/f damper at bsmt side entry to shaft.
BLD-Conference9/6/20019/7/20019/10/2001APASS
DetailsCarl Dependahl
###-#### keep c/n, still need arch's detail, complete shaft at horiz section. 9/11/2001 1:42:59 PM
BLD-Conference9/7/20019/7/20019/7/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 9/7/2001 5:25:57 PM need archs detail...not submitted as yet.
BLD-Conference9/5/20019/6/20019/6/2001AFAIL
DetailsJim Storey
###-#### early am billy ray not able to attened meetting / remove shaft and resch. 9/6/2001 10:06:58 AM
BLD-Conference9/5/20019/6/20019/6/2001PCANC
DetailsJim Storey
Scheduled by Inspector: 340 On 9/5/2001 5:23:23 PM dave ###-####...re shaft w/ BRS. for Bob
BLD-Conference9/5/20019/5/20019/5/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/5/2001 10:29:13 AM w/ ah re shaft const...keep c/n
BLD-Framing/Rough-in9/4/20019/5/20019/5/2001AFAIL
DetailsCarl Dependahl
###-####, c/n, shaft details, hvac penetrations at bsmt lid, fireblocks at soffits, need fire sprinkler r/i 9/4/2001 4:53:10 PM
BLD-Framing/Rough-in9/4/20019/5/20019/5/2001AFAIL
DetailsCarl Dependahl
###-####; keep c/n re shaft; wants to meet w/ arch onsite 9-6 9/5/2001 5:25:47 PM
BLD-Framing/Rough-in8/7/20018/8/20018/8/2001PPART
DetailsCarl Dependahl
9415036 8/7/2001 5:01:06 PM; 1st floor ok pend elec. 8/8/2001 3:32:36 PM
BLD-Conference8/7/20018/7/20018/7/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 8/7/2001 11:25:53 AM ok to cover back of ATM kiosk pend elec...
BLD-Conference8/3/20018/6/20018/6/2001APASS
DetailsCarl Dependahl
conf-- insp terry-- ###-#### ; c/n issued re roof drains; ok to use 3rd floor offices pending fire ok 8/6/2001 11:53:40 AM
FIRE-Conference8/6/20018/6/20018/6/2001PPART
DetailsRick Jackson
Terry ###-#### okat to occupy 3rd floor 8/6/2001 4:09:42 PM
BLD-Final8/2/20018/3/20018/3/2001PNR
DetailsCarl Dependahl
###-####; n/r...need consult w/ GS & plan chk re partial ok for occupancy 8/6/2001 9:42:25 AM