BLD-Final | 9/25/2001 | 9/25/2001 | 9/25/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 07:35:42. Contact: ###-####. final ok card on site. 9/25/2001 3:07:05 PM
|
BLD-Framing/Rough-in | 8/30/2001 | 8/31/2001 | 8/31/2001 | A | FAIL |
Jim Storey
|
|
|
###-#### greg this is a re -inspect wires not attched to framing east wall. 9/5/2001 9:16:06 AM
|
FIRE-Final Inspection | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Rick Jackson
|
|
|
gregg ###-####
|
FIRE-Conference | 8/29/2001 | 8/29/2001 | 8/29/2001 | P | PART |
Rick Jackson
|
|
|
fire for conf-- greg ###-#### requirements for final; sprinklers, alarm and extinguisehrs 8/29/2001 11:02:08 AM
|
BLD-Framing/Rough-in | 8/28/2001 | 8/28/2001 | 8/28/2001 | P | FAIL |
Jim Storey
|
|
|
1. (Suspended acoustical tile and lay-in panel ceilings) Metal suspension systems for acoustical tile and for lay-in panel ceilings shall comply with 1997 UBC Standard 25-2 (ASTM C635-69 & C636-69). (1997 UBC 2502.4) Note requirements for seismic bracing.) need wall primitor wires min 12 ga.
|
BLD-Framing/Rough-in | 8/1/2001 | 8/2/2001 | 8/2/2001 | A | FAIL |
Jim Storey
|
|
|
r/i- late am????? greg- ###-#### no plan on site city approved. 8/2/2001 11:00:47 AM
|
BLD-Framing/Rough-in | 8/2/2001 | 8/2/2001 | 8/2/2001 | P | PART |
Jim Storey
|
|
|
###-#### plans are on site need mech insp for cover ok to proceed upon approval from mech. insp. 8/2/2001 2:31:19 PM
|