Permanent Occupancy | | 3/14/2002 | 3/14/2002 | | DONE |
|
|
|
|
BLD-Grading Inspection | 11/20/2001 | 11/20/2001 | 11/20/2001 | P | PASS |
Rita DeYoung
|
|
|
###-#### Final not grading--signed--ok for issuance of Temp. c. of o. A few signatures are need under perm. before the perm c. of o. can be issued.
11/20/2001 3:09:19 PM
|
FIRE-Final Inspection | 11/19/2001 | 11/19/2001 | 11/19/2001 | P | PASS |
Rick Jackson
|
|
|
###-#### charlie
|
BLD-Framing/Rough-in | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | PASS |
Jim Storey
|
|
|
###-#### ceilling ok for cover. 11/14/2001 10:48:14 AM
|
BLD-Final | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | NR |
Jim Storey
|
|
|
fn ###-####- charlie ceilling ok for cover not a final insp. 11/14/2001 10:49:31 AM
|
BLD-Framing/Rough-in | 11/8/2001 | 11/9/2001 | 11/9/2001 | A | NR |
Dave Hannah
|
|
|
CEILING GRID ###-#### CHARLIE
|
BLD-Framing/Rough-in | 11/9/2001 | 11/9/2001 | 11/9/2001 | P | PART |
Russ Owen
|
|
|
CEILING GRID CHARLIE ###-#### . Needs some perimeter wires over the 3 compartment sink . will leave tile out at this area to verify. 11/9/2001 1:45:00 PM
|
BLD-Framing/Rough-in | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | PART |
Jim Storey
|
|
|
###-#### charlie ###-#### charlie hip ridge hangers to be secured at ceilling insp. 10/9/2001 3:55:53 PM
|
BLD-Framing/Rough-in | 9/27/2001 | 9/27/2001 | 9/27/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-#### CHARLIE c/n: substitution of members (3x or PSL cols, etc.).., install all hdwe; nailing basically ok to start siding. 9/27/2001 4:27:19 PM
|
BLD-Foundation | 9/11/2001 | 9/11/2001 | 9/11/2001 | P | PASS |
Steven Webb
|
|
|
for main floor charlie-- ###-#### floor slab 9/11/2001 2:17:27 PM
|
BLD-Foundation | 8/28/2001 | 8/29/2001 | 8/29/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-#### CHARLIE
|
BLD-Footing | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | PASS |
Steven Webb
|
|
|
FT INSP CHARLIE ###-####
|