Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-01600
StatusFinaled
Name PIZZA HUT
Site Address 2450 S VISTA AVE
Project NamePIZZA HUT
Customer Number 
ePlanReviewNo
Description
PIZZA HUT RESTAURANT - TO CONSTRUCT A NEW 2380 SQUARE FOOT, ONE STORY, WOOD FRAMED PIZZA RESTAURANT BUILDING WITH SIT DOWN, PICKUP AND DELIVERY. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. ALL CONSTRUCTION PER THE APROVED PLANS AND ATTACHED COMMENT LIST. DRH01-00091/PC#491-01/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 3/14/20023/14/2002 DONE
Details
BLD-Grading Inspection11/20/200111/20/200111/20/2001PPASS
DetailsRita DeYoung
###-#### Final not grading--signed--ok for issuance of Temp. c. of o. A few signatures are need under perm. before the perm c. of o. can be issued.
11/20/2001 3:09:19 PM
FIRE-Final Inspection11/19/200111/19/200111/19/2001PPASS
DetailsRick Jackson
###-#### charlie
BLD-Framing/Rough-in11/13/200111/14/200111/14/2001APASS
DetailsJim Storey
###-#### ceilling ok for cover. 11/14/2001 10:48:14 AM
BLD-Final11/13/200111/13/200111/13/2001PNR
DetailsJim Storey
fn ###-####- charlie ceilling ok for cover not a final insp. 11/14/2001 10:49:31 AM
BLD-Framing/Rough-in11/8/200111/9/200111/9/2001ANR
DetailsDave Hannah
CEILING GRID ###-#### CHARLIE
BLD-Framing/Rough-in11/9/200111/9/200111/9/2001PPART
DetailsRuss Owen
CEILING GRID CHARLIE ###-#### . Needs some perimeter wires over the 3 compartment sink . will leave tile out at this area to verify. 11/9/2001 1:45:00 PM
BLD-Framing/Rough-in10/8/200110/9/200110/9/2001APART
DetailsJim Storey
###-#### charlie ###-#### charlie hip ridge hangers to be secured at ceilling insp. 10/9/2001 3:55:53 PM
BLD-Framing/Rough-in9/27/20019/27/20019/27/2001PFAIL
DetailsCarl Dependahl
###-#### CHARLIE c/n: substitution of members (3x or PSL cols, etc.).., install all hdwe; nailing basically ok to start siding. 9/27/2001 4:27:19 PM
BLD-Foundation9/11/20019/11/20019/11/2001PPASS
DetailsSteven Webb
for main floor charlie-- ###-#### floor slab 9/11/2001 2:17:27 PM
BLD-Foundation8/28/20018/29/20018/29/2001APASS
DetailsTom Arcoraci
###-#### CHARLIE
BLD-Footing8/27/20018/28/20018/28/2001APASS
DetailsSteven Webb
FT INSP CHARLIE ###-####