Description
(RIVER WALK CENTER)(Suite #200) New 6,900 sq.ft. tenant on 2nd floor of existing building for office use per approved plans on file. Work to include demolishing almost all interior walls on second floor, new accessible elevator installation for upgrade work, building structural modifications for new elevator shaft, new interior walls, new interior doors and windows, interior finish, new suspended ceiling installation, mechanical work, plumbing work, and electrical work. This work is considered Phase I and is being done in conjunction with another permit of BLD01-02102. A CERTIFICATE OF OCCUPANCY IS TO BE ISSUED WHEN COMPLETED AND APPROVED. Interior demolition of the 2nd floor performed under BLD01-01710. NOTE: This building is NOT fire sprinklered. Exterior parking lot work approved under DRH01-00093. (P.C.#0508-01) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/17/200112/18/200112/18/2001APASS
DetailsCarl Dependahl
###-####; ph 1 ok; stairs/rails to be done w/ ph.2 12/18/2001 10:59:08 AM
Permanent Occupancy 12/18/200112/18/2001 DONE
Details
BLD-Final12/14/200112/17/200112/17/2001ANR
DetailsCarl Dependahl
###-####.nr, need final for elev by elec. 12/17/2001 10:30:17 AM
BLD-Final11/27/200111/28/200111/28/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/27/2001 at 14:53:33. Contact: ###-####. c/n glazing signage, elev cert, ok for t/o. 11/28/2001 5:57:06 PM
FIRE-Final Inspection11/27/200111/28/200111/28/2001APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/27/2001 at 14:51:52. Contact: ###-####.
BLD-Final11/26/200111/27/200111/27/2001PNR
DetailsCarl Dependahl
###-####
FIRE-Final Inspection11/26/200111/27/200111/27/2001PCANC
DetailsTroy Cobbley
To be rescheduled by contractor 11/27/2001 2:46:23 PM
BLD-Framing/Rough-in11/23/200111/26/200111/26/2001APART
DetailsCarl Dependahl
###-#### CEILING...add perim. wires at server room, seismic pod over west stair area; ok to continue, chk at final. 11/26/2001 10:32:23 AM
FIRE-Final Inspection11/26/200111/26/200111/26/2001PNR
DetailsRick Jackson
###-####
BLD-Footing11/13/200111/14/200111/14/2001PPART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 11/13/2001 3:29:13 PM ext ftg ok 11/14/2001 3:47:01 PM
BLD-Framing/Rough-in11/13/200111/14/200111/14/2001PPART
DetailsCarl Dependahl
###-#### RICK clg ok pend elec. 11/14/2001 2:26:04 PM
BLD-Conference11/13/200111/13/200111/13/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/13/2001 12:23:43 PM w/ framer & bldr re exit signs & clg reqs
BLD-Conference11/13/200111/13/200111/13/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/13/2001 9:16:37 AM w/ supt. re ceiling req's.
BLD-Foundation11/13/200111/13/200111/13/2001PNR
DetailsCarl Dependahl
###-#### rick
FIRE-Conference11/9/200111/13/200111/13/2001APART
DetailsRick Jackson
###-#### RICK exit sign coverage; alarm submittals required for elevator recall 11/13/2001 11:32:26 AM
BLD-Foundation11/8/200111/8/200111/8/2001PPART
DetailsCarl Dependahl
###-#### RICK west side ext footing/frost wall 11/8/2001 2:42:43 PM
BLD-Foundation11/5/200111/6/200111/6/2001APART
DetailsCarl Dependahl
rick ###-#### ; isolated ext ftgs ok. 11/6/2001 11:47:08 AM
BLD-Framing/Rough-in11/6/200111/6/200111/6/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/6/2001 3:59:16 PM grid...add spacer bars, perimeter wires, & seismic pods at areas >144s.f. also met w/ arch onsite, will provide resubmittal for Dr. Hollingsworth space at 1st fl.
BLD-Framing/Rough-in10/30/200110/31/200110/31/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/30/2001 at 13:45:49. Contact: ###-####. Elevator shaft and 2 footings at entry.(columns). 10/31/2001 4:29:18 PM
BLD-Framing/Rough-in10/18/200110/19/200110/19/2001ANR
DetailsCarl Dependahl
###-####...east stair "enclosure" ok to cover. 10/19/2001 11:27:06 AM
BLD-Framing/Rough-in10/17/200110/18/200110/18/2001APART
DetailsCarl Dependahl
###-#### RICK 2nd fl r. rm. entry walls ok 10/18/2001 11:40:50 AM
BLD-Conference10/15/200110/15/200110/15/2001PPASS
DetailsCarl Dependahl
###-#### re 2nd fl rest rms & floor joist mod, ok per spec/plans 10/15/2001 6:00:46 PM
BLD-Foundation10/5/200110/8/200110/8/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/05/2001 at 09:19:30. Contact: ###-####. elev pit walls and adjacent 10/8/2001 4:31:56 PM
BLD-Framing/Rough-in10/5/200110/8/200110/8/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/05/2001 at 09:20:15. Contact: ###-####. hvac chases; seal draft stops thru-out 10/8/2001 4:33:18 PM
BLD-Footing10/2/200110/3/200110/3/2001PPART
DetailsCarl Dependahl
###-####, elev pit base & walls 10/3/2001 3:07:30 PM
BLD-Framing/Rough-in10/2/200110/3/200110/3/2001PPART
DetailsCarl Dependahl
2nd fl. int partitions except chases ok 10/3/2001 3:08:26 PM