Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-01647
StatusFinaled
Name TAMURA & ASSOCIATES
Site Address 575 E PARKCENTER BLVD
Project NameZIEGLER TAMURA BLDG
Customer Number 
ePlanReviewNo
Description
ZIEGLER TAMURA OFFICE BUILDING (SHELL) - TO CONSTRUCT A NEW 16,000 SQ. FT., ONE STORY, WOOD FRAMED OFFICE SHELL BUILDING AND RELATED SITE IMPROVEMENTS. THIS IS A SHELL PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. NOTE: THIS BUILDING IS LOCATED IN A FLOOD PLAIN AREA. A FLOOD PLAIN CERTIFICATE, SHOWING COMPLIANCE, IS REQUIRED TO BE SUBMITTED TO THE BUILDING DEPARTMENT AS SOON AS POSSIBLE AFTER CONSTRUCTION OF THE FOUNDATION AND PLACEMENT OF THE SLAB FLOOR. JCM/DRH00-00153/PC#506-01 GRADING UNDER PERMIT BLD01-00865.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval  1/9/2004 DONE
Code Occupancy Approval5/8/20025/8/20025/8/2002PPASS
DetailsWm. Michael Meloy
Scheduled by Inspector: WMM On 5/8/2002 12:37:40 PM Inspection noted landscaping as per plans. 5/8/2002 12:43:41 PM
BLD-Final4/15/20024/15/20024/15/2002PPASS
DetailsJim Storey
fn occ ###-####- mike final ok pending others. 4/15/2002 2:01:43 PM
FIRE-Final Inspection4/11/20024/11/20024/11/2002PPASS
DetailsRick Jackson
Added by Inspector: 409 On 4/11/2002 3:17:13 PM
FIRE-Final Inspection4/9/20024/10/20024/10/2002PFAIL
DetailsTroy Cobbley
duct detectors still not wired correctly, structural inspector to verify door hardware, address numbers are temporary as the permanant are on order, fire extinguisher has been mounted 4/10/2002 3:45:27 PM
BLD-Framing/Rough-in4/5/20024/8/20024/8/2002ANR
DetailsJim Storey
###-#### MIKE (SHELL)
FIRE-Final Inspection4/8/20024/8/20024/8/2002PFAIL
DetailsTroy Cobbley
duct detectors are not wired and could not be tested 4/9/2002 9:56:23 AM
BLD-Framing/Rough-in4/3/20024/4/20024/4/2002AFAIL
DetailsJim Storey
###-#### tape draftstop joints 4/4/2002 11:58:46 AM
BLD-Framing/Rough-in1/2/20021/2/20021/2/2002PPASS
DetailsJim Storey
NAIL MIKE ###-#### exterior ok to cover. 1/2/2002 2:25:32 PM
BLD-Framing/Rough-in12/28/200112/28/200112/28/2001PPART
DetailsJim Storey
###-#### only north and east walls ok for cover. 12/28/2001 2:32:05 PM
BLD-Framing/Rough-in12/26/200112/27/200112/27/2001AFAIL
DetailsJim Storey
###-#### sheer nailing received engineering/archived/ need more naills and rfi for pipes through sheer pannels. c/n on site. 12/27/2001 2:31:45 PM
BLD-Framing/Rough-in12/3/200112/4/200112/4/2001AFAIL
DetailsRuss Owen
for nailing insp-- mike- ###-#### . need engineer to clairify hold-down attachement to studs and nailing c/n given to framer on site. 12/4/2001 2:05:17 PM
BLD-Foundation10/4/200110/4/200110/4/2001PPASS
DetailsDave Hannah
Added by Inspector: 425 On 10/4/2001 1:19:50 PM
BLD-Footing10/1/200110/1/200110/1/2001PPASS
DetailsSteven Webb
###-#### mike