BLD-Final | 5/28/2002 | 5/29/2002 | 5/29/2002 | A | CANC |
Jim Storey
|
|
|
###-#### ERIC called and cancled. 5/29/2002 11:32:24 AM
|
BLD-Final | 5/29/2002 | 5/29/2002 | 5/29/2002 | P | PASS |
Steven Webb
|
|
|
###-#### ERIC C. of C. #22407 issued. 5/29/2002 2:28:40 PM
|
BLD-Grading Inspection | 5/23/2002 | 5/23/2002 | 5/23/2002 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage complete and approved.
|
BLD-Final | 5/22/2002 | 5/22/2002 | 5/22/2002 | P | FAIL |
Tony Young
|
|
|
ERIC ###-####
need trades b-4 we can sign off ,,(hillside), no inspection made 5/22/2002 2:28:47 PM
|
BLD-Conference | 5/16/2002 | 5/16/2002 | 5/16/2002 | P | PART |
Tony Young
|
|
|
eric ###-#### call 1st
walk through on final, ///trades, handrail, plans, firecaulk, trades, hillside, etc. 5/16/2002 1:32:54 PM
|
BLD-Final | 5/10/2002 | 5/13/2002 | 5/13/2002 | A | NR |
Russ Owen
|
|
|
fn occ- ###-####- rente . Needs hill side approval prior to calling for a bld final, called this number. 5/13/2002 12:00:35 PM
|
BLD-Conference | 4/24/2002 | 4/24/2002 | 4/24/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/24/2002 at 08:01:58. Contact: ###-####. 1 step less than 8 inch ok after landing 4/24/2002 1:29:25 PM
|
BLD-Energy code compliance | 12/19/2001 | 12/19/2001 | 12/19/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 08:36:29. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/19/2001 | 12/19/2001 | 12/19/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 08:35:24. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/17/2001 | 12/18/2001 | 12/18/2001 | A | PART |
Tony Young
|
|
|
re- inspect shear on new addition, ////not ready, will look at framing 12/18/2001 2:25:38 PM
|
BLD-Other | 12/17/2001 | 12/18/2001 | 12/18/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/17/2001 at 15:20:33. Contact: ###-####.part ok, need full height studs on hold downs, headers installed 12/18/2001 2:19:18 PM
|
BLD-Other | 12/17/2001 | 12/17/2001 | 12/17/2001 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/17/2001 at 10:24:09. Contact: ###-####.
|
BLD-Footing | 11/20/2001 | 11/21/2001 | 11/21/2001 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/20/2001 at 14:14:08. Contact: ###-####. called to canc this inspection 11-21-01///dld
|
BLD-Energy code compliance | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/19/2001 at 09:15:25. Contact: ###-####. ok to cover 11/20/2001 2:51:02 PM
|
BLD-Energy code compliance | 11/20/2001 | 11/20/2001 | 11/20/2001 | P | DONE |
Tony Young
|
|
|
420 took this 11/20/2001 3:56:28 PM
|
BLD-Framing/Rough-in | 11/16/2001 | 11/16/2001 | 11/16/2001 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/16/2001 at 08:10:15. Contact: ###-####. un able to under stand c/n to verrfy complince. 11/16/2001 2:51:19 PM
|
BLD-Framing/Rough-in | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/14/2001 at 20:11:41. Contact: ###-####. c/n posted on right side unit main floor--ok to insulate 11/15/2001 10:38:10 AM
|
BLD-Framing/Rough-in | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | FAIL |
Dave Hannah
|
|
|
###-#### no city approved plans or truss engin on site called contact # left message 11/14/2001 11:00:18 AM
|
BLD-Wall cover | 10/16/2001 | 10/17/2001 | 10/17/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/16/2001 at 14:41:47. Contact: ###-####.
ok to rock part of lid for ducting and rock between floor joists for firewall 10/17/2001 12:01:06 PM
|
BLD-Other | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/11/2001 at 10:12:51. Contact: ###-####. sheer nailling ok/drop soffit gyp in place for p/l side of wall. 10/12/2001 9:55:41 AM
|
BLD-Other | 10/3/2001 | 10/4/2001 | 10/4/2001 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/03/2001 at 14:51:42. Contact: ###-####.
need draft stops, and arch re-submit on duplex vs. townhouse, //// built as duplex when plans show to be built as town house, also need a complete set of plans w/ plan check notes 10/4/2001 1:49:44 PM
|
BLD-Framing/Rough-in | 9/26/2001 | 9/26/2001 | 9/26/2001 | P | PASS |
Steven Webb
|
|
|
for wall insp -###-####- mike Fire wall 1st. floor between units. 9/26/2001 3:40:51 PM
|
BLD-Foundation | 8/17/2001 | 8/20/2001 | 8/20/2001 | A | PART |
Tony Young
|
|
|
###-#### jared
wip, verbal corrections on horizontal bar, may need ltr from eng. 8/20/2001 1:14:48 PM
|
BLD-Grading Inspection | 8/10/2001 | 8/10/2001 | 8/10/2001 | | PASS |
Rita DeYoung
|
|
|
footing subgrade has been approved by Briggs Engineering.
|
BLD-Footing | 8/8/2001 | 8/8/2001 | 8/8/2001 | P | NR |
Tony Young
|
|
|
FT INSP GERAD- ###-####
need soils test and T. Records approval 8/8/2001 2:13:58 PM
|