BLD-Final | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### MATT c.c # 22029 issued 11/7/2001 10:47:31 AM
|
BLD-Final | 11/6/2001 | 11/6/2001 | 11/6/2001 | P | FAIL |
Steven Webb
|
|
|
###-#### c/n issued 11/6/2001 2:11:38 PM
|
BLD-Energy code compliance | 9/21/2001 | 9/21/2001 | 9/21/2001 | P | PASS |
Steven Webb
|
|
|
###-#### ok to cover 9/21/2001 1:20:28 PM
|
BLD-Energy code compliance | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | PART |
Dave Hannah
|
|
|
###-#### ok to cover every thing but garage and bouns room over garage 9/20/2001 9:36:53 AM
|
BLD-Energy code compliance | 9/20/2001 | 9/20/2001 | 9/20/2001 | P | NR |
Steven Webb
|
|
|
insulation matt- ###-####
|
BLD-Energy code compliance | 9/19/2001 | 9/19/2001 | 9/19/2001 | P | FAIL |
Steven Webb
|
|
|
matt ###-#### insulation--c/n issued--no energy report, insulation not completed and no vapor barrier at time of inspection--. 9/19/2001 1:58:18 PM
|
BLD-Framing/Rough-in | 9/18/2001 | 9/18/2001 | 9/18/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### matt crew finished allc/n item before leaving ok to insulate no c/n items 9/18/2001 1:49:57 PM
|
BLD-Framing/Rough-in | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | NR |
Russ Owen
|
|
|
fr matt ###-####
|
BLD-Framing/Rough-in | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | PASS |
Steven Webb
|
|
|
###-#### SHEAR--OK 9/10/2001 2:10:59 PM
|
BLD-Framing/Rough-in | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | PART |
Steven Webb
|
|
|
SHEER WALL ###-#### MATT ok to side except garage--need to verify garage shear blocks are installed and nailed. 9/7/2001 2:38:09 PM
|
BLD-Footing | 8/3/2001 | 8/3/2001 | 8/3/2001 | P | PART |
Steven Webb
|
|
|
todd ###-#### ft insp wip 8/3/2001 2:12:25 PM
|