Permit Information
Permit NumberBLD01-01778
StatusFinaled
Name WILLIAM PAMELA LAWELLIN
Site Address 75 S COTTERELL DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 5441 sq. ft. two story single family dwelling (5059 sq. ft. first floor/382 sq. ft. second floor) with a 556 sq. ft. basement. (Basement is mechanical NOT habitable space, a separate permit is required to make habitable). There is 5321 sq. ft. of garage (1590 sq. ft. four car garage attached to the dwelling, 1692 sq. ft. detached shop, and a 2039 sq. ft. detached R.V. garage). There is approximatly 644 sq. ft. of covered porch. Per approved plans, engineering and requirement list. PC#482 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/15/20044/16/20044/16/2004APASS
DetailsTroy James
Scheduled by a contractor via Hello! on 4/15/2004 at 1:15:45 PM. Contact: ###-####.
BLD-Final3/10/20043/11/20043/11/2004AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 3/10/2004 at 12:55:32 PM. Contact: ###-####. Gave home owner a correction notice on site. 3/10/2004 11:26:03 PM
BLD-Other11/3/200311/3/200311/3/2003PPART
DetailsRuss Owen
Phone conference with Bill, ###-####. Requested a $40,000.00 bond for concrete flatwork. This project will be ok for a LC, with bonding conditon stated on LC, when bond is posted and other outstanding code requirements have been completed.
BLD - Request for Extension10/31/200310/31/200310/31/2003PDONE
DetailsRuss Owen
###-#### dale Ok to extend permit work near completion. 10/30/2003 8:02:26 PM
BLD-Final10/13/200310/15/200310/15/2003AFAIL
DetailsRuss Owen
scott; Phone #: ###-#### Internet Inspection Request from: Annette Moore went over requirements for a final , one item needed is paved driveway. also some other items . 10/15/2003 5:06:35 PM
BLD-Conference7/1/20037/1/20037/1/2003PPART
DetailsRuss Owen
SCOTT; Phone #: ###-#### Internet Inspection Request from: Annette Moore. went over egress from basement. 7/1/2003 5:20:22 PM
BLD-Conference4/25/20034/25/20034/25/2003PPART
DetailsRuss Owen
SCOTT; Phone #: ###-#### Internet Inspection Request from: Darla DownsWiil need 36 min at 1st landing for guard rail. 4/25/2003 1:26:28 PM
BLD-Energy code compliance2/14/20032/18/20032/18/2003PPASS
DetailsJim Sly
###-####
BLD-Framing/Rough-in2/7/20032/7/20032/7/2003PPASS
DetailsRuss Owen
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung. All items complete , Note has interior drywall shear contractor notified. 2/7/2003 4:03:40 PM
BLD-Framing/Rough-in2/5/20032/6/20032/6/2003AFAIL
DetailsRuss Owen
steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. C/N posted on on front window. 2/6/2003 2:31:30 PM
BLD-Framing/Rough-in1/7/20031/8/20031/8/2003AFAIL
DetailsRuss Owen
###-#### exterior nailing. still has shear panel at left of front door need perimeter staples contractor on site will recall this when coplete warned of re-inspection fee if not done.by next inspection. 1/8/2003 4:54:46 PM
BLD-Framing/Rough-in1/6/20031/7/20031/7/2003APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/06/2003 at 13:57:53. Contact: . c/n posted 2 add staples/nails above 3 hold downs. also need to insulate basement walls as went over with contractor. 1/7/2003 10:53:48 AM
BLD-Foundation12/3/200212/4/200212/4/2002AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/03/2002 at 11:55:50. Contact: ###-####. shear at house not foundation, posted c/n. 12/4/2002 3:48:45 PM
BLD-Conference11/22/200211/22/200211/22/2002AFAIL
DetailsRuss Owen
Stoped by job and notified and posted c/n to remove paper at areas that have been sided with out approval. NOTE THIS IS A FULLY ENGINEERED STRUCTURE. and may require engineer of record to sign off. Called and left a message with steve l and home owner on site. 11/22/2002 10:35:57 AM
BLD-Conference11/22/200211/22/200211/22/2002ACANC
DetailsRuss Owen
BLD-Footing10/11/200210/11/200210/11/2002PPART
DetailsRuss Owen
Phone #: ###-#### Internet Inspection Request from: Amy Lawson
BLD-Foundation10/4/200210/4/200210/4/2002PPART
DetailsJim Storey
###-#### ###-#### wall at east end of house aprox. 40 ln/ft pwoi. 10/4/2002 4:01:11 PM
BLD-Foundation8/26/20028/26/20028/26/2002PPART
DetailsRuss Owen
jed- ###-####
BLD-Foundation8/19/20028/19/20028/19/2002PPART
DetailsRuss Owen
###-#### 1/2 of house walls. 8/19/2002 3:28:27 PM
BLD-Footing8/12/20028/13/20028/13/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/12/2002 at 09:27:02. Contact: ###-####.ok about 80 percent of footing for home complete. 8/13/2002 11:12:21 AM
BLD-Framing/Rough-in7/24/20027/25/20027/25/2002PPASS
DetailsJim Sly
STEVE ; Phone #: ###-####
BLD-Framing/Rough-in7/22/20027/23/20027/23/2002AFAIL
DetailsRuss Owen
steve ; Phone #: ###-#### 2 bld'sneed truss det , a bolts. 7/23/2002 12:15:35 PM
BLD-Foundation6/27/20026/27/20026/27/2002PPART
DetailsRuss Owen
found wall- jed ###-#### Ok pending engineers approval. 6/27/2002 4:57:54 PM
BLD-Foundation6/27/20026/27/20026/27/2002PPART
DetailsRuss Owen
found wall- jed ###-#### . ok pending engineers approval. 6/27/2002 4:59:19 PM
BLD-Footing6/21/20026/21/20026/21/2002PPART
DetailsRuss Owen
JED ###-#### portion of basement. 6/21/2002 4:28:34 PM
BLD-Foundation6/4/20026/5/20026/5/2002APART
DetailsTom Arcoraci
###-#### JED
BLD-Foundation5/31/20025/31/20025/31/2002PCANC
DetailsRuss Owen
###-#### jed. needed to pour at 12, engineer has approved via site visit. 5/31/2002 4:13:47 PM
BLD-Foundation5/28/20025/28/20025/28/2002PPART
DetailsRuss Owen
###-####-jed found top of retaining wall. 5/28/2002 4:03:07 PM
BLD-Foundation5/23/20025/23/20025/23/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/23/2002 at 08:15:21. Contact: ###-####.retaining wall , engineer also performed inspection. 5/23/2002 4:00:46 PM
BLD-Footing5/15/20025/16/20025/16/2002APASS
DetailsRuss Owen
ft insp- jed- ###-#### Retaining wall. 5/16/2002 12:26:05 PM
BLD-Foundation5/6/20025/6/20025/6/2002PPART
DetailsRuss Owen
###-#### JED . poured appears ok, 5:40 pm , had meeting this day unable to make before 5:00. 5/6/2002 6:42:17 PM
BLD-Foundation5/2/20025/2/20025/2/2002PPASS
DetailsRuss Owen
###-#### JED wall 5/2/2002 4:28:32 PM 5/2/2002 4:28:46 PM
BLD-Footing5/1/20025/1/20025/1/2002PPASS
DetailsRuss Owen
jed ###-#### ft. garage footing. 5/1/2002 4:38:03 PM
BLD-Footing4/24/20024/25/20024/25/2002PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/24/2002 at 11:48:24. Contact: ###-####.
BLD-Footing4/19/20024/19/20024/19/2002PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/19/2002 at 09:24:19. Contact: ###-####. footing for rv storage. 4/19/2002 4:53:35 PM
BLD-Conference4/1/20024/1/20024/1/2002APART
DetailsRuss Owen
Slow progress. Work will begin in May.
BLD-Aging Inspection1/21/20021/21/20021/21/2002 PART
DetailsRuss Owen
no insp called 1/22/2002 4:43:01 PM