BLD-Final | 1/14/2002 | 1/15/2002 | 1/15/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/14/2002 at 16:18:32. Contact: ###-####. c/n made ok.final ok. 1/15/2002 3:17:15 PM
|
BLD-Final | 1/10/2002 | 1/11/2002 | 1/11/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 12:23:05. Contact: ###-####. c/n on site 1/11/2002 10:27:39 AM
|
BLD-Energy code compliance | 10/25/2001 | 10/25/2001 | 10/25/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/25/2001 2:55:27 PM add insul at crawl/rim
|
BLD-Framing/Rough-in | 10/25/2001 | 10/25/2001 | 10/25/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### MIKE FINAL AND READY TO DRY WALL...add blocking at joists/brg walls near crawl access & insul rim/pony walls, chk at final...need temp glazing by gar. stair upper landing. ok to rock. 10/25/2001 2:54:48 PM
|
BLD-Framing/Rough-in | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | PASS |
Jim Storey
|
|
|
###-#### mike framing c/n made ok. 10/22/2001 2:14:36 PM
|
BLD-Conference | 10/18/2001 | 10/19/2001 | 10/19/2001 | P | PASS |
Jim Storey
|
|
|
###-#### JANE
|
BLD-Framing/Rough-in | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | FAIL |
Jim Sly
|
|
|
###-####
NR 10/18/2001 4:59:31 PM
|
BLD-Framing/Rough-in | 10/3/2001 | 10/4/2001 | 10/4/2001 | A | PART |
Steven Webb
|
|
|
###-#### SHEAR--ok to side lower floor--re-inspection needed on shear panels upstairs. 10/4/2001 9:40:57 AM
|
BLD-Framing/Rough-in | 10/4/2001 | 10/4/2001 | 10/4/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### MIKE SHEER PANEL ok to cover ext 10/4/2001 3:30:47 PM
|
BLD-Foundation | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | PASS |
Jim Storey
|
|
|
###-#### jed walls ok 8/14/2001 9:56:34 AM
|
BLD-Footing | 8/9/2001 | 8/9/2001 | 8/9/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### WIP 8/9/2001 2:48:08 AM
|