BLD-Conference | 3/28/2002 | 4/2/2002 | 4/2/2002 | A | PASS |
Tony Young
|
|
|
check landing on master br, cont. handrail 4/1/2002 1:10:37 PM
ok at this time. 4/2/2002 10:24:24 AM
|
BLD-Final | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | PASS |
Tony Young
|
|
|
fn insp- clyde- ###-####
|
BLD-Grading Inspection | 3/28/2002 | 3/28/2002 | 3/28/2002 | | PASS |
Rita DeYoung
|
|
|
FINAL GRADING AND DRAINAGE IS APPROVED
|
BLD-Final | 3/26/2002 | 3/27/2002 | 3/27/2002 | P | FAIL |
Tony Young
|
|
|
CLIVE 870--9919
conf. only on final, no c/n, just a verbal punch list, not a formal inspection 3/27/2002 3:14:14 PM
|
BLD-Final | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | NR |
Tony Young
|
|
|
CLIVE ###-####
|
BLD-Aging Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 | | PART |
Tony Young
|
|
|
|
BLD-Energy code compliance | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | PASS |
Tony Young
|
|
|
Scheduled by Inspector: 407 On 11/5/2001 4:51:56 PM
|
BLD-Energy code compliance | 11/5/2001 | 11/5/2001 | 11/5/2001 | P | CANC |
Russ Owen
|
|
|
###-#### george. 11/5/2001 4:54:52 PM rescheduled for am 11/6. unable to do. 11/5/2001 4:55:46 PM
|
BLD-Framing/Rough-in | 10/31/2001 | 11/1/2001 | 11/1/2001 | A | PASS |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 10/26/2001 | 10/29/2001 | 10/29/2001 | A | FAIL |
Tony Young
|
|
|
###-#### GEORGE
c/n posted, no insulation 10/29/2001 10:50:33 AM
|
BLD-Framing/Rough-in | 10/10/2001 | 10/11/2001 | 10/11/2001 | A | NR |
Tony Young
|
|
|
call framer ###-####
|
BLD-Framing/Rough-in | 10/11/2001 | 10/11/2001 | 10/11/2001 | P | PART |
Tony Young
|
|
|
re-inspect shear ###-#### 10/11/2001 11:05:28 AM
ext. shear ok w/ corrections 10/11/2001 2:56:39 PM
|
BLD-Framing/Rough-in | 10/11/2001 | 10/11/2001 | 10/11/2001 | P | PART |
Tony Young
|
|
|
Added by Inspector: 415 On 10/11/2001 3:37:03 PM ext. shear ok pending structural engineer report/approval on tall walls as built or fix
|
BLD-Framing/Rough-in | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | FAIL |
Tony Young
|
|
|
###-####--shear nail 10/9/2001 9:07:28 AM
c/n posted 10/10/2001 10:33:45 AM
|
BLD-Framing/Rough-in | 10/8/2001 | 10/8/2001 | 10/8/2001 | P | FAIL |
Tony Young
|
|
|
###-#### SHEARNAIL
c/n posted 10/9/2001 9:05:53 AM
|
BLD-Foundation | 8/16/2001 | 8/16/2001 | 8/16/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 10:02:13. Contact: ###-####.wip, ok, verbal correction 8/16/2001 2:18:19 PM
|
BLD-Footing | 8/15/2001 | 8/15/2001 | 8/15/2001 | P | PART |
Tony Young
|
|
|
###-#### randy
house ftgs ok 8/15/2001 4:11:11 PM
|
BLD-Foundation | 7/27/2001 | 7/27/2001 | 7/27/2001 | P | PART |
Tony Young
|
|
|
Michael ###-####
basement walls and garage walls ok w/ verbal corrections 7/27/2001 4:33:09 PM
|
BLD-Footing | 7/24/2001 | 7/25/2001 | 7/25/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/24/2001 at 21:57:04. Contact: ###-####.basement ftgs ok and garage ftgs ok w/ verbal corrections///wip on all 7/25/2001 11:20:59 AM
|
BLD-Footing | 7/24/2001 | 7/24/2001 | 7/24/2001 | P | CANC |
Tony Young
|
|
|
###-####
|