Code Occupancy Approval | 12/7/2001 | 12/7/2001 | 12/7/2001 | P | PASS |
Wm. Michael Meloy
|
|
|
Scheduled by Inspector: WMM On 12/7/2001 2:19:16 PM
|
BLD-Conference | 12/4/2001 | 12/4/2001 | 12/4/2001 | P | FAIL |
Wm. Michael Meloy
|
|
|
Scheduled by Inspector: WMM On 12/4/2001 12:43:30 PM. I met with Curtis (Curt) Prater, Wireless Facilities, 2401 S. Applem J 106, ###-#### and cell ###-####. The site was inspected for Occupancy and it was noted that the painting has not been completed on the southeast corner of the dwelling. This portion was due to be completed by Friday, weather permiting. I provided Curt Prater with information on Bonding for Temp Occupancy. r 12/4/2001 12:48:21 PM
|
BLD-Conference | 12/3/2001 | 12/3/2001 | 12/3/2001 | P | FAIL |
Russ Owen
|
|
|
###-#### CURT PLEASE CALL FIRST. 12/3/2001 11:28:25 AM. needs f-t ratings at penetrations and zoning approval. 12/3/2001 5:04:15 PM
|
BLD-Final | 11/30/2001 | 12/3/2001 | 12/3/2001 | A | CANC |
Russ Owen
|
|
|
###-#### ###-####
|
FIRE-Alarm Testing | 11/27/2001 | 11/30/2001 | 11/30/2001 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinkler, fire alarm finaled. OK for perm occ 11/30/2001 12:58:13 PM
|
BLD-Framing/Rough-in | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | DONE |
Dave Hannah
|
|
|
###-#### ROOF talked with contractor and hilty rep about how and what they are going to use to seal up penatrations in roof ok to cover 11/20/2001 11:01:57 AM
|
BLD-Framing/Rough-in | 10/24/2001 | 10/24/2001 | 10/24/2001 | P | PART |
Russ Owen
|
|
|
###-#### JUSTIN . called contractor he will supply approval from eng for pins at bottom track for subst of puddle welds. 10/24/2001 4:57:27 PM
|
BLD-Framing/Rough-in | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | CANC |
Russ Owen
|
|
|
###-#### justin 10-22-01 justin called in to canc this inspection....dld
|
BLD-Framing/Rough-in | 10/18/2001 | 10/19/2001 | 10/19/2001 | A | PART |
Russ Owen
|
|
|
###-#### JUSTIN. Bottom trac attached with steel pins not welds as per plan ,waiting for engineer approval. 10/19/2001 12:09:52 PM
|
BLD-Footing | 10/2/2001 | 10/3/2001 | 10/3/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 12:19:54. Contact: ###-####. spec insp needed on steel 10/3/2001 1:51:42 PM
|
BLD-Foundation | 10/2/2001 | 10/3/2001 | 10/3/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 12:21:33. Contact: ###-####. spec insp needed on steel 10/3/2001 1:52:00 PM
|
BLD-Foundation | 9/28/2001 | 10/2/2001 | 10/2/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/28/2001 at 15:54:37. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/28/2001 | 10/2/2001 | 10/2/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/28/2001 at 15:46:08. Contact: ###-####.
|