BLD-Final | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | PASS |
Russ Owen
|
|
|
post card mailed
|
BLD-Final | 1/30/2002 | 1/31/2002 | 1/31/2002 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 07:41:54. Contact: ###-####.
|
BLD-Final | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 06:32:24. Contact: ###-####.
c/n still posted on stairs, waiting for material to complete, also finishing up on 1 hr fire protection in mech. room, c of c issued for bank purposes only, owner and contractor both acknowledge 1/31/2002 1:37:13 PM
|
BLD-Final | 1/18/2002 | 1/18/2002 | 1/18/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### c/n on site 1/18/2002 4:06:36 PM
|
BLD-Grading Inspection | 1/18/2002 | 1/18/2002 | 1/18/2002 | | BOND |
Rita DeYoung
|
|
|
Grading is conditionally approved upon receipt of a $1500.00 bond to ensure satisfactory completion of fine grading, revegetation and a retaining wall on the east side of the property.
|
BLD-Final | 1/17/2002 | 1/17/2002 | 1/17/2002 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/17/2002 at 08:17:32. Contact: ###-####.need trades signed offf, including Terry Records on hillside 1/17/2002 3:23:17 PM
|
BLD-Aging Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 | | PART |
Tony Young
|
|
|
wip 1/7/2002 10:01:39 AM
|
BLD-Energy code compliance | 11/7/2001 | 11/7/2001 | 11/7/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/07/2001 at 06:58:39. Contact: ###-####. walls, floor ok 11/7/2001 3:38:44 PM
|
BLD-Framing/Rough-in | 11/5/2001 | 11/5/2001 | 11/5/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 11/2/2001 | 11/2/2001 | 11/2/2001 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/02/2001 at 09:00:37. Contact: ###-####. c/n on site ok to insulate 11/2/2001 3:13:37 PM
|
BLD-Framing/Rough-in | 10/31/2001 | 11/1/2001 | 11/1/2001 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/31/2001 at 07:43:09. Contact: ###-####.need trades signed off 1st, no inspection made 11/1/2001 11:01:50 AM
|
BLD-Framing/Rough-in | 10/25/2001 | 10/26/2001 | 10/26/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/25/2001 at 18:45:00. Contact: ###-####.
ext shear ok 10/29/2001 8:51:22 AM
|
BLD-Framing/Rough-in | 10/17/2001 | 10/17/2001 | 10/17/2001 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/17/2001 at 07:00:26. Contact: ###-####.need letter of compliance on shear and holddowns as built from structural engineer 10/17/2001 12:05:08 PM
|
BLD-Framing/Rough-in | 10/16/2001 | 10/16/2001 | 10/16/2001 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/16/2001 at 09:09:10. Contact: ###-####.no plans///not all the way done 10/17/2001 8:23:30 AM
|
BLD-Foundation | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PART |
Tony Young
|
|
|
verify found, and arch. approval 9/5/2001 2:23:50 PMverbal ok/fix from arch. pending letter 9/6/2001 12:17:36 PM
|
BLD-Foundation | 9/5/2001 | 9/5/2001 | 9/5/2001 | P | PART |
Tony Young
|
|
|
BILL ###-####
need fix or approval for mis-layout from arch. 9/5/2001 1:24:07 PM
|
BLD-Footing | 8/16/2001 | 8/16/2001 | 8/16/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 08:43:50. Contact: ###-####.
wip, verbal corrections/warnings 8/16/2001 1:45:04 PM
|