Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-01922
StatusFinaled
Name EVERGREEN PLAZA SHOPPING CENTER
Site Address 3019 N COLE RD
Project NameEVERGREEN PLAZA
Customer Number 
ePlanReviewNo
Description
(EVERGREEN PLAZA SHOPPING CENTER) (Structure's at SE Corner of Complex, Considered One Building For Code Compliance Upgrade Purposes) Phase II-A of code upgrade agreement on file. To remove existing roof covering to wood deck; to structurally modify the four corners of the existing room area by constructing a reinforced, raised corner section to bring into line with existing roof structure; to install new Monier "Lifetile" concrete tile roof covering over the entire roof structure; to modify the exterior perimeter soffit & supporting column structure to carry the new roof loads and upgrade fire-resistive construction to meet 1-hour code requirements and to add slump block with concrete cap around columns. All per approved plans, engineering and 'Letter of Agreement" for Phase II-A. This facility was previously occupied as a full service bar & restaurant for the majority of the area and two smaller office spaces along the west side at the court area. THIS PERMIT DOES NOT AUTHORIZE OR DECLARE ANY OCCUPANCY OR USE. Further upgrades will be done as a condition of each tenant improvement before any occupancy is allowed or before next May 30, 2002 per agreement, whichever is first. A "LETTER OF COMPLETION / COMPLIANCE" IS REQUIRED AS EVIDENCE OF FINAL INSPECTIONS AND APPROVAL OF THE PHASE II-A PORTION. (P.C.#0581-01)/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference6/10/20026/10/20026/10/2002PCANC
DetailsRuss Owen
Scheduled by Inspector: 407 On 6/10/2002 5:15:23 PM just needed to check history. 6/11/2002 11:27:03 AM
FIRE-Final Inspection5/29/20025/30/20025/30/2002ACANC
DetailsRick Jackson
###-#### dave fire not required for sign off on this permit 5/30/2002 10:40:38 AM
BLD-Framing/Rough-in2/21/20022/22/20022/22/2002ACANC
DetailsDave Hannah
###-####
BLD-Final1/2/20021/2/20021/2/2002PPASS
DetailsDave Hannah
###-####ok for c.c 1/2/2002 4:21:51 PM
BLD-Aging Inspection12/5/200112/5/200112/5/2001 DONE
DetailsDave Hannah
work in progress 12/5/2001 2:41:18 PM
BLD-Framing/Rough-in10/1/200110/2/200110/2/2001ANR
DetailsDave Hannah
###-#### first layer of sheetrock on columns and draft stops in eves 10/2/2001 11:28:23 AM
BLD-Framing/Rough-in9/26/20019/27/20019/27/2001APASS
DetailsDave Hannah
fr insp john ###-#### have letter from engineer on c/n item oking hanger 9/27/2001 9:32:04 AM
BLD-Framing/Rough-in8/27/20018/28/20018/28/2001AFAIL
DetailsJim Sly
shawn ###-####- fr -late am?? Install MTHM2 hanger at upper end of ridge beam or Eng to approve ones installed. 8/28/2001 11:56:59 AM
BLD-Footing8/14/20018/15/20018/15/2001APASS
DetailsDave Hannah
###-####
BLD-Framing/Rough-in8/15/20018/15/20018/15/2001APASS
DetailsDave Hannah
Added by Inspector: 425 On 8/15/2001 11:52:28 AM nw sw and se roof framing on corners