BLD-Conference | 6/10/2002 | 6/10/2002 | 6/10/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 6/10/2002 5:15:23 PM just needed to check history. 6/11/2002 11:27:03 AM
|
FIRE-Final Inspection | 5/29/2002 | 5/30/2002 | 5/30/2002 | A | CANC |
Rick Jackson
|
|
|
###-#### dave fire not required for sign off on this permit 5/30/2002 10:40:38 AM
|
BLD-Framing/Rough-in | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | CANC |
Dave Hannah
|
|
|
###-####
|
BLD-Final | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | PASS |
Dave Hannah
|
|
|
###-####ok for c.c 1/2/2002 4:21:51 PM
|
BLD-Aging Inspection | 12/5/2001 | 12/5/2001 | 12/5/2001 | | DONE |
Dave Hannah
|
|
|
work in progress 12/5/2001 2:41:18 PM
|
BLD-Framing/Rough-in | 10/1/2001 | 10/2/2001 | 10/2/2001 | A | NR |
Dave Hannah
|
|
|
###-#### first layer of sheetrock on columns and draft stops in eves 10/2/2001 11:28:23 AM
|
BLD-Framing/Rough-in | 9/26/2001 | 9/27/2001 | 9/27/2001 | A | PASS |
Dave Hannah
|
|
|
fr insp john ###-#### have letter from engineer on c/n item oking hanger 9/27/2001 9:32:04 AM
|
BLD-Framing/Rough-in | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | FAIL |
Jim Sly
|
|
|
shawn ###-####- fr -late am?? Install MTHM2 hanger at upper end of ridge beam or Eng to approve ones installed. 8/28/2001 11:56:59 AM
|
BLD-Footing | 8/14/2001 | 8/15/2001 | 8/15/2001 | A | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 8/15/2001 | 8/15/2001 | 8/15/2001 | A | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 8/15/2001 11:52:28 AM nw sw and se roof framing on corners
|