Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-01938
StatusFinaled
Name CHRIS CONNER CONSTRUCTION LL
Site Address 2102 W MOCCASIN CT
Project NameHILLSIDE
Customer Number 
ePlanReviewNo
Description
To construct a 2869 sq. ft. two story single family dwelling with a 974 sq. ft. attached three car garage, a 231 sq. ft. partially covered concrete patio and a 72 sq. ft. covered 2nd level deck per approved plans, all engineering/red-lining and attached requirement lists. This lot is located within the hillside area and is subject to the hillside ordinances. Class "A" roof system and defensible area will be maintained. (1st floor 2134 sq. ft.)(2nd floor 735 sq. ft.) PC #518 CUP#44-94 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  11/6/2002 DONE
BLD-Final3/26/20023/27/20023/27/2002APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 03/26/2002 at 08:29:57. Contact: ###-####.
hand rail ok'd by 325, c of c issued 3/27/2002 11:15:16 AM
BLD-Final2/12/20022/13/20022/13/2002AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 02/12/2002 at 15:01:32. Contact: ###-####.
c/n posted 2/13/2002 2:36:13 PM
BLD-Grading Inspection2/13/20022/13/20022/13/2002 DONE
DetailsRita DeYoung
Final grading and drainage approved
BLD-Final1/30/20021/31/20021/31/2002ANR
DetailsTony Young
call chris conner 1st, see history for ph# 1/30/2002 4:26:38 PM
BLD-Final1/29/20021/30/20021/30/2002ANR
DetailsTony Young
Scheduled by a contractor via Hello! on 01/29/2002 at 07:53:37. Contact: ###-####.
BLD-Final1/30/20021/30/20021/30/2002PNR
DetailsTony Young
final inspection 1/30/2002 10:53:07 AM
BLD-Aging Inspection1/7/20021/7/20021/7/2002 PART
DetailsTony Young
wip 1/7/2002 10:16:40 AM
BLD-Wall cover11/6/200111/7/200111/7/2001APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/06/2001 at 11:29:41. Contact: ###-####.
BLD-Framing/Rough-in11/5/200111/5/200111/5/2001PFAIL
DetailsTom Arcoraci
###-#### CHRIS cn posted 11/5/2001 3:44:30 PM
BLD-Framing/Rough-in11/1/200111/2/200111/2/2001APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 11/01/2001 at 10:55:55. Contact: ###-####.Shear only--not ready for frame-missing mechanical r. i. approval. Ok to side. 11/2/2001 10:36:49 AM
BLD-Footing9/13/20019/13/20019/13/2001PPART
DetailsTony Young
chris ###-#### 9/13/2001 11:22:46 AM
great room epoxy cololm bolts, 8 total,,, t/w arch. via phone on procedure, ok 9/13/2001 2:17:09 PM
BLD-Footing8/20/20018/21/20018/21/2001APART
DetailsTony Young
###-#### tim
need letter from eng on alt. column on back shear wall 8/21/2001 10:52:00 AM
BLD-Footing8/15/20018/16/20018/16/2001APART
DetailsTony Young
###-####
wip but need to see more, need to clarify detail on steel column w/in stemwall 8/16/2001 11:38:57 AM
BLD-Footing8/16/20018/16/20018/16/2001PPART
DetailsTony Young
verbal corrections 8/16/2001 2:15:27 PM
BLD-Grading Inspection8/14/20018/14/20018/14/2001 PASS
DetailsRita DeYoung
Footing subgrade has been approved by the geotechnical engineer.