BLD-Aging Inspection | 12/18/2003 | 12/18/2003 | 12/18/2003 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 1/30/2003 | 1/31/2003 | 1/31/2003 | A | PASS |
Tom Arcoraci
|
|
|
###-#### ok for perm occ 1/31/2003 11:10:37 AM
|
Permanent Occupancy | | 1/31/2003 | 1/31/2003 | | DONE |
|
|
|
|
BLD-Final | 11/7/2002 | 11/8/2002 | 11/8/2002 | A | NR |
Tom Arcoraci
|
|
|
###-####--scott
|
BLD-Conference | 6/4/2002 | 6/4/2002 | 6/4/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 6/4/2002 1:52:40 PM explained hand rail requirements 6/4/2002 4:29:44 PM
|
BLD-Final | 5/29/2002 | 5/30/2002 | 5/30/2002 | A | FAIL |
Jim Storey
|
|
|
1. (Ramp handrails) Ramps having slopes steeper than 1 unit vertical in 20 units horizontal shall have handrails as required for stairways, except that intermediate handrails shall not be required. (1997 UBC 1003.3.4.5)
2. (Handrail extensions and returns at ramps) Handrails shall be continuous the full length of the ramp and at least one handrail shall extend in the direction of the ramp run not less than 12 inches beyond the top of the ramp nor less than 12 inches beyond the bottom of the ramp. Ends shall be returned or shall have rounded terminations or bends. (1997 UBC 1003.3.3.6) Note the exceptions for private ramps and dwelling units.
3. (Allowed projections into stairway width) Handrails may project into the required width a distance of 3-1/2 inches from each side of a stairway. Stringers and other projections such as trim and similar decorative features may project into the required width 1-1/2 inches from each side. (1997 UBC 1003.3.3.2)
5. (Height of handrails for stairways) The top of handrails and handrail extensions shall not be placed less than 34 inches nor more than 38 inches above landings and the nosing of treads. (1997 UBC 1003.3.3.6)
6. smoke seal on 20 min fire door.
|
BLD-Final | 2/13/2002 | 2/14/2002 | 2/14/2002 | P | PART |
Tom Arcoraci
|
|
|
fn insp todd- ###-#### ok for temp occ see c/notice 2/14/2002 11:10:41 AM
|
BLD-Final | 2/11/2002 | 2/12/2002 | 2/12/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/11/2002 at 14:13:31. Contact: ###-####. Needs all required signatures on job card, Still has bld corrections but would be ok for a temporary oc, when other agencies sign off. 2/12/2002 12:11:40 PM 2/12/2002 12:12:07 PM
|
BLD-Final | 2/7/2002 | 2/8/2002 | 2/8/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### C/N on site. 2/8/2002 10:30:12 AM
|
FIRE-Final Inspection | 2/7/2002 | 2/7/2002 | 2/7/2002 | P | PASS |
Troy Cobbley
|
|
|
Life/safety finaled. Notified contractor to change door hardware in basement corridor 2/7/2002 3:30:10 PM
|
BLD-Framing/Rough-in | 12/14/2001 | 12/17/2001 | 12/17/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/14/2001 at 16:41:53. Contact: . masonary wall header insp only 12/17/2001 9:58:01 AM
|
BLD-Conference | 11/15/2001 | 11/15/2001 | 11/15/2001 | P | FAIL |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 11/15/2001 3:03:42 PM needs eng for cut out in masonary wall for door no detail on plan
|
BLD-Foundation | 11/15/2001 | 11/15/2001 | 11/15/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Footing | 11/5/2001 | 11/6/2001 | 11/6/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### ROBERT
|