Permit Information
Permit NumberBLD01-01951
StatusFinaled
Name DILLON LTD. PARTNERSHIP
Site Address 2713 S HILTON ST
Project NameDILLON LTD. PARTNERSHIP
Customer Number 
ePlanReviewNo
Description
(DILLON LTD. PARTNERSHIP - CONVERT HOUSE TO OFFICE) This building is NOT fire sprinklered. To convert a 1,735 square foot dwelling (1,055 square foot first floor and 680 square foot basement) to an office. The 340 square foot 2nd floor is being abandoned and is not approved for occupancy. Work is to include a new exterior basement stairway, a basement enclosure, a restroom accessible to the disabled, a glass sliding door, an exterior deck, and an accessible exterior ramp all per approved drawings and plan review conditions on file. The parking lot improvements are covered under permit BLD00-03546. CUP99-00136 PC-0606-01 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/18/200312/18/200312/18/2003 PASS
DetailsTom Arcoraci
BLD-Final1/30/20031/31/20031/31/2003APASS
DetailsTom Arcoraci
###-#### ok for perm occ 1/31/2003 11:10:37 AM
Permanent Occupancy 1/31/20031/31/2003 DONE
Details
BLD-Final11/7/200211/8/200211/8/2002ANR
DetailsTom Arcoraci
###-####--scott
BLD-Conference6/4/20026/4/20026/4/2002PPASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 6/4/2002 1:52:40 PM explained hand rail requirements 6/4/2002 4:29:44 PM
BLD-Final5/29/20025/30/20025/30/2002AFAIL
DetailsJim Storey
1. (Ramp handrails) Ramps having slopes steeper than 1 unit vertical in 20 units horizontal shall have handrails as required for stairways, except that intermediate handrails shall not be required. (1997 UBC 1003.3.4.5)

2. (Handrail extensions and returns at ramps) Handrails shall be continuous the full length of the ramp and at least one handrail shall extend in the direction of the ramp run not less than 12 inches beyond the top of the ramp nor less than 12 inches beyond the bottom of the ramp. Ends shall be returned or shall have rounded terminations or bends. (1997 UBC 1003.3.3.6) Note the exceptions for private ramps and dwelling units.

3. (Allowed projections into stairway width) Handrails may project into the required width a distance of 3-1/2 inches from each side of a stairway. Stringers and other projections such as trim and similar decorative features may project into the required width 1-1/2 inches from each side. (1997 UBC 1003.3.3.2)



5. (Height of handrails for stairways) The top of handrails and handrail extensions shall not be placed less than 34 inches nor more than 38 inches above landings and the nosing of treads. (1997 UBC 1003.3.3.6)

6. smoke seal on 20 min fire door.
BLD-Final2/13/20022/14/20022/14/2002PPART
DetailsTom Arcoraci
fn insp todd- ###-#### ok for temp occ see c/notice 2/14/2002 11:10:41 AM
BLD-Final2/11/20022/12/20022/12/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/11/2002 at 14:13:31. Contact: ###-####. Needs all required signatures on job card, Still has bld corrections but would be ok for a temporary oc, when other agencies sign off. 2/12/2002 12:11:40 PM 2/12/2002 12:12:07 PM
BLD-Final2/7/20022/8/20022/8/2002AFAIL
DetailsJim Sly
###-#### C/N on site. 2/8/2002 10:30:12 AM
FIRE-Final Inspection2/7/20022/7/20022/7/2002PPASS
DetailsTroy Cobbley
Life/safety finaled. Notified contractor to change door hardware in basement corridor 2/7/2002 3:30:10 PM
BLD-Framing/Rough-in12/14/200112/17/200112/17/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/14/2001 at 16:41:53. Contact: . masonary wall header insp only 12/17/2001 9:58:01 AM
BLD-Conference11/15/200111/15/200111/15/2001PFAIL
DetailsTom Arcoraci
Added by Inspector: 408 On 11/15/2001 3:03:42 PM needs eng for cut out in masonary wall for door no detail on plan
BLD-Foundation11/15/200111/15/200111/15/2001PPASS
DetailsTom Arcoraci
###-####
BLD-Footing11/5/200111/6/200111/6/2001PPASS
DetailsTom Arcoraci
###-#### ROBERT