BLD-Final | 7/16/2002 | 7/16/2002 | 7/16/2002 | P | PART |
Russ Owen
|
|
|
RUSS; Phone #: ###-####Ok for a perm oc if all required signatures are on card. 7/16/2002 4:05:55 PM. 7/16/2002 4:07:06 PM
|
Permanent Occupancy | | 7/16/2002 | 7/16/2002 | | DONE |
|
|
|
|
BLD-Final | 7/15/2002 | 7/15/2002 | 7/15/2002 | P | FAIL |
Russ Owen
|
|
|
208/221/6881 fn occ burke --. c/n for fire caulk and rear door hdwr. 7/15/2002 3:07:56 PM
|
BLD-Final | 3/21/2002 | 3/22/2002 | 3/22/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/21/2002 at 20:24:32. Contact: ###-####. C/n posted for corrections. Would be ok for a temp oc pending all required signatures 3/22/2002 2:38:38 PM
|
FIRE-Final Inspection | 3/22/2002 | 3/22/2002 | 3/22/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled. fire alarm permit to be voided 3/22/2002 4:04:53 PM
|
FIRE-Final Inspection | 3/21/2002 | 3/21/2002 | 3/21/2002 | P | FAIL |
Rick Jackson
|
|
|
fire fn ###-####- chris west exit door hardware; it appears that a fire alarm system is being installed without plans, alarm plans have been received as part of this project but not isssued 3/21/2002 2:47:56 PM
|
BLD-Framing/Rough-in | 3/14/2002 | 3/15/2002 | 3/15/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/14/2002 at 16:15:31. Contact: .
|
BLD-Framing/Rough-in | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | PART |
Russ Owen
|
|
|
chris ###-####. need to complete the rear area by stairs. 3/14/2002 4:48:19 PM
|
BLD-Wall cover | 1/22/2002 | 1/23/2002 | 1/23/2002 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/22/2002 at 19:11:59. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/14/2002 at 18:31:27. Contact: ###-####. I have approved the revised floor plan and have a letter owner 1/15/2002 4:38:19 PM 1/15/2002 4:39:16 PM a 1/15/2002 4:39:16 PM to employ no more than 4 people. 1/15/2002 4:39:48 PM
|
BLD-Framing/Rough-in | 1/13/2002 | 1/14/2002 | 1/14/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/13/2002 at 20:49:46. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/10/2002 | 1/11/2002 | 1/11/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/10/2002 at 22:09:08. Contact: ###-####. Need revised floor plan resolved and approved. 1/11/2002 1:17:01 PM
|
BLD-Framing/Rough-in | 1/8/2002 | 1/9/2002 | 1/9/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/08/2002 at 23:32:06. Contact: .Posted c/n, for framing and plan modification. 1/9/2002 12:18:59 PM
|
BLD-Framing/Rough-in | 1/7/2002 | 1/8/2002 | 1/8/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/07/2002 at 19:04:54. Contact: . Need to complete all prior c/n items do not sheetrock,posted c/n, also no one at site. contact number not given. 1/8/2002 12:00:05 PM
|
BLD-Framing/Rough-in | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | FAIL |
Russ Owen
|
|
|
###-#### SHEER WALL and interior. 1/2/2002 5:30:55 PM
|
BLD-Framing/Rough-in | 12/10/2001 | 12/11/2001 | 12/11/2001 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/10/2001 at 14:29:10. Contact: ###-####.c/n posted. 12/11/2001 4:37:12 PM
|
BLD-Foundation | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/11/2001 at 18:34:06. Contact: ###-####.
|
BLD-Foundation | 10/10/2001 | 10/11/2001 | 10/11/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/10/2001 at 17:57:27. Contact: ###-####.
|
BLD-Footing | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/04/2001 at 17:02:49. Contact: .footing. 10/5/2001 11:26:12 AM
|
BLD-Footing | 10/3/2001 | 10/4/2001 | 10/4/2001 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/03/2001 at 22:47:07. Contact: .Needs revised site 10/4/2001 10:45:25 AM
|