Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-01992
StatusFinaled
Name KEILTY CONSTRUCTION
Site Address 47 W HORIZON DR
Project NameRESIDENTIAL REMODEL
Customer Number 
ePlanReviewNo
Description
This project is for a 2100s.f. 3-story with basement addition to an esisting 2-story 3500s.f. single family dwelling. This project is fully engineered and will require special inspections for reinforced concrete as designed @ 3500psi and structural steel welding per 1997UBC Chapter 17. Smoke detectors per UBC 310.9 are required. R-1B setbacks ok per ajb and hwg not considered hillside per terry records less than 15% slope. All per the approved plans as marked and attached engineering. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/20/20032/20/20032/20/2003PPASS
DetailsTony Young
###-#### perry please call for access
l of c issued 2/20/2003 3:49:54 PM
BLD-Final1/15/20031/16/20031/16/2003ACANC
DetailsRuss Owen
call first ###-####out of time rcalled for pm. 1/16/2003 12:55:29 PM
BLD-Final1/16/20031/16/20031/16/2003PFAIL
DetailsRuss Owen
This 1/16/2003 1:35:39 PMThis is not ready pre-inspection only, no plans and I have not much of an idea as to the work that was permited. I left a c/n for some items ,may need more pending plans and other mis from inspector with prior history. 1/16/2003 1:38:17 PM
BLD-Final1/15/20031/15/20031/15/2003PCANC
DetailsJim Storey
CALL FIRST ###-####
BLD-Conference10/30/200210/31/200210/31/2002APASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
on attic issues, no firedoor reqd, guard rails, etc. 10/31/2002 10:43:09 AM
BLD-Conference10/4/200210/7/200210/7/2002APART
DetailsTony Young
###-#### KYLE
conf. on storage area, stairs, guardrail, handrail to meet code 10/7/2002 11:27:53 AM
BLD-Conference8/22/20028/23/20028/23/2002APASS
DetailsTony Young
###-#### TERRY PLEASE CALL 1ST
head room above winder stairs should finish out ok w/ 1/2" sheetrock. to get 6' 8" 8/23/2002 12:29:31 PM
BLD-Conference8/23/20028/23/20028/23/2002PPASS
DetailsTony Young
see other notes 8/23/2002 4:02:20 PM
BLD-Framing/Rough-in8/16/20028/19/20028/19/2002APASS
DetailsDave Hannah
###-#### perry everything on c/n list completed but for stairs they will need to be cheched at final 8/19/2002 10:46:55 AM
BLD-Energy code compliance8/12/20028/12/20028/12/2002PPART
DetailsDave Hannah
terry; Phone #: ###-#### seal package holes foamed but still needs to seal around bottom plate 8/12/2002 2:38:26 PM
BLD-Framing/Rough-in8/12/20028/12/20028/12/2002PPART
DetailsDave Hannah
terry; Phone #: ###-#### 4 of 6 items complete ok to insulate 8/12/2002 2:37:13 PM
BLD-Framing/Rough-in7/11/20027/11/20027/11/2002PFAIL
DetailsTony Young
###-#### perry
c/n posted 7/11/2002 2:52:50 PM
BLD-Conference7/2/20027/2/20027/2/2002PPART
DetailsTony Young
see other notes 7/2/2002 1:34:04 PM
BLD-Conference6/28/20027/2/20027/2/2002APART
DetailsTony Young
richard- ###-#### for conf
conf on stairs and loft w/ guardrail per code,,, storage only, just open to bed rooms 7/2/2002 1:33:43 PM
BLD-Conference6/28/20027/1/20027/1/2002ACANC
DetailsJim Sly
richard- ###-#### for conf Richard preferred to talk to insp over this area on stair issue. 7/1/2002 10:54:39 PM
BLD-Framing/Rough-in6/10/20026/11/20026/11/2002ANR
DetailsCarl Dependahl
shear wall brian ###-#### c/n...need eng'g...spec insp for moment frame??? recall 6/11/2002 1:04:01 PM
BLD-Framing/Rough-in6/11/20026/11/20026/11/2002PFAIL
DetailsCarl Dependahl
shear nailing, /c/n onsite...$42 fee due if eng'g not onsite for next insp...left msg w/ supt. 6/11/2002 1:09:10 PM
BLD-Wall cover4/1/20024/2/20024/2/2002ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/01/2002 at 13:33:07. Contact: ###-####.Need attached egineering not on plan,also does not appear to be completed, contractor on site will recall. 4/2/2002 4:42:29 PM
BLD-Conference3/21/20023/21/20023/21/2002PPASS
DetailsAlan Hauser
went over hvac with heating contractor 3/21/2002 3:11:06 PM
BLD-Aging Inspection1/28/20021/28/20021/28/2002 PART
DetailsTony Young
BLD-Aging Inspection11/28/200111/28/200111/28/2001 PART
DetailsTony Young
wip 11/28/2001 9:37:52 AM
BLD-Conference9/27/20019/27/20019/27/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/27/2001 9:34:39 AM w/ Bob Eason re concrete insp & found modification
BLD-Foundation9/26/20019/27/20019/27/2001APART
DetailsTony Young
###-#### BOBwip, 9/27/2001 11:32:55 AM
BLD-Foundation9/24/20019/24/20019/24/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/24/2001 at 07:28:21. Contact: ###-####....ext portion fnd wall; hd's & imbeds not set; add'l eng'g req'd to change configuration of wall below existing dwelling to block. design is 2500psi. 9/24/2001 12:01:14 PM
BLD-Footing9/19/20019/20/20019/20/2001APART
DetailsTony Young
###-####
basement ftgs, wip, ok 9/20/2001 11:45:05 AM