Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-01993
StatusFinaled
Name KNIPE JANOUSH KNIPE
Site Address 1661 W SHORELINE DR
Project NameRIVER WALK CENTER
Customer Number 
ePlanReviewNo
Description
(RIVER WALK CENTER)(PHASE II OF II) Structural modifications and exterior renovation of existing office building per approved plans on file and DRH01-00093. Work to include demolition of portions of the existing structure, construction of new entry/exit vestibules and canopies at front of building, some new structural floor framing around west interior stairway, construction of a new second floor exterior balcony with guardrail at rear of building, upgrading existing west interior stairway by enclosing risers and providing new handrails/guardrails per code, new exterior wall covering with E.I.F.S. system and thin brick veneer, new roof covering, new storefront windows and doors at new entry/exit vestibules, interior finish work, electrical work, and site work. This is a Scope of Work Permit. LETTER OF COMPLETION TO BE ISSUED WHEN DONE. NOTE: THIS BUILDING IS LOCATED IN THE FLOOD PLAIN. FINISH FLOOR HEIGHT TO BE AT 2676.8' PER ELEVATION CERTIFICATE ON FILE. NOTE: This building is NOT fire sprinklered. (P.C.#0615-01) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/1/200310/1/200310/1/2003 PASS
DetailsDave Hannah
BLD-Aging Inspection7/2/20037/2/20037/2/2003 DONE
DetailsCarl Dependahl
ph 2 7/2/2003 5:58:49 PM
BLD-Conference7/2/20037/2/20037/2/2003PPASS
DetailsRick Jackson
Rick, call Carl D. this is okay for fire final 7/2/2003 2:50:06 PM
BLD-Final7/2/20037/2/20037/2/2003PPASS
DetailsCarl Dependahl
struct. ok for l/c...parking/drainage, etc have been superceded by adjacent project permits 7/2/2003 6:02:30 PM
FIRE-Final Inspection7/2/20037/2/20037/2/2003PPASS
DetailsRick Jackson
BLD-Conference2/14/20032/14/20032/14/2003PPASS
DetailsCarl Dependahl
remainder of site work may complete w/ following expansion. bld02-02687? 2/14/2003 3:00:12 PM
BLD-Conference3/26/20023/26/20023/26/2002PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/26/2002 4:05:01 PM ...need revised landscape/parking plan submitted for review to P&Z, etc. 3/26/2002 4:44:12 PM
BLD-Conference3/22/20023/25/20023/25/2002APASS
DetailsCarl Dependahl
###-#### phase 2 stair rail upgrade ok. 3/25/2002 11:11:09 AM
BLD-Conference2/25/20022/25/20022/25/2002PPASS
DetailsCarl Dependahl
rick ###-####; re stairs: remove underlay at top of run, adjust other risers to best result...existing steel framed stair. Stairs at other side will require proper rails per 1003,ubc. 2/25/2002 5:17:03 PM
BLD-Framing/Rough-in2/21/20022/22/20022/22/2002PPART
DetailsJim Storey
###-#### rick ceilling ok /stair riser at top of run 8 inches. 2/22/2002 2:42:24 PM
BLD-Final2/6/20022/7/20022/7/2002ANR
DetailsCarl Dependahl
###-####
BLD-Framing/Rough-in2/7/20022/7/20022/7/2002APART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/7/2002 11:29:29 AM ok to cover, verify efis specs when onsite; 75/450 max
BLD-Framing/Rough-in2/5/20022/6/20022/6/2002PPART
DetailsCarl Dependahl
###-#### furring ok to cover at entry...need weld report. 2/6/2002 4:47:43 PM
BLD-Framing/Rough-in1/2/20021/3/20021/3/2002APART
DetailsCarl Dependahl
###-####...front ca 1/3/2002 12:18:44 PM nopies ok, need welds certified 1/3/2002 12:18:56 PM 1/3/2002 12:19:41 PM
BLD-Framing/Rough-in1/2/20021/3/20021/3/2002PPART
DetailsCarl Dependahl
###-####...rear deck beams & joists ok 1/3/2002 12:20:49 PM
BLD-Framing/Rough-in12/21/200112/26/200112/26/2001APART
DetailsCarl Dependahl
RICK ###-#### "west" entry roof framing ok to cover. 12/26/2001 10:43:25 AM
BLD-Conference12/17/200112/17/200112/17/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/17/2001 12:05:11 PM re struct details; complete stairs, rails, etc...elev ok. w/ ph.1
BLD-Foundation11/21/200111/23/200111/23/2001PPASS
DetailsTom Arcoraci
###-#### RICK
BLD-Foundation11/20/200111/20/200111/20/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/20/2001 at 08:48:06. Contact: ###-####.
BLD-Foundation11/14/200111/15/200111/15/2001ACANC
DetailsJim Storey
###-#### RICK carl did insp. 11/15/2001 9:30:39 AM
BLD-Foundation11/15/200111/15/200111/15/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/15/2001 10:56:06 AM east ext ftg/frost wall at entry ok
BLD-Conference11/13/200111/13/200111/13/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/13/2001 12:25:47 PM w/ bldr & arch onsite re exit reqs