BLD-Final | 8/22/2002 | 8/22/2002 | 8/22/2002 | P | PASS |
Jim Sly
|
|
|
Letter of approval from Pinnacle Engineers and letter from MTI.
|
FIRE-Final Inspection | 8/22/2002 | 8/22/2002 | 8/22/2002 | A | PASS |
Troy Cobbley
|
|
|
Fire life/safety, fire alarm and fire sprinkler finaled
|
Code Occupancy Approval | 8/12/2002 | 8/12/2002 | 8/12/2002 | P | PASS |
Scott M.Brown
|
|
|
EVERYTHING IN PLACE, FINAL SIGNED. 8/12/2002 3:50:10 PM
|
BLD-Concrete | 2/21/2002 | 2/25/2002 | 2/25/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/21/2002 at 08:25:47. Contact: ###-####. Subject to S-I. 2/25/2002 4:40:26 PM
|
BLD-Framing/Rough-in | 2/22/2002 | 2/25/2002 | 2/25/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/22/2002 at 14:56:54. Contact: ###-####. wip ok to cover elec room and ext furred out walls 2/25/2002 9:24:50 AM
|
BLD-Aging Inspection | 1/8/2002 | 1/8/2002 | 1/8/2002 | | PART |
Russ Owen
|
|
|
wip 1/15/2002 9:06:20 AM
|
BLD-Foundation | 11/7/2001 | 11/8/2001 | 11/8/2001 | A | PART |
Russ Owen
|
|
|
pending s-i. 11/8/2001 3:22:00 PM
|
BLD-Footing | 10/22/2001 | 10/23/2001 | 10/23/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### mti inspecting rebar and concrete 10/23/2001 9:52:00 AM
|
BLD-Foundation | 10/19/2001 | 10/22/2001 | 10/22/2001 | A | PART |
Russ Owen
|
|
|
###-#### MIKE . ok pending s-i. 10/22/2001 4:09:19 PM
|