Permit Information
Permit NumberBLD01-02028
StatusFinaled
Name HA' PENNY BRIDGE & HAPPY FISH SUSHI
Site Address 855 W BROAD ST STE 250
Project Name9TH STREET WAREHOUSES
Customer Number 
ePlanReviewNo
Description
(HA' PENNY BRIDGE & HAPPY FISH SUSHI) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To create a 4,400 square foot restaurant/bar and construct tenant improvements. This tenant will also have additional seating on a common exterior porch. Work is to include interior nonbearing walls, infilled openings in a 1-hr corridor wall, a raised platform, a gypsum board ceiling, a suspended ceiling, a 1-hr shaft for a grease duct, mill work, and equipment all per approved drawings and plan review conditions on file. The Ha'Penny Bridge portion of this tenant space shall have the maximum allowed occupant load (143) posted on a permanent sign near the main exit. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. DRH00-00252 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/28/20023/29/20023/29/2002APASS
DetailsCarl Dependahl
###-#### barry ok for c/o. 3/29/2002 4:15:29 PM
Permanent Occupancy 3/29/20023/29/2002 DONE
Details
BLD-Conference3/28/20023/28/20023/28/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/28/2002 10:25:35 AM keep t/o open...wip
BLD-Conference3/15/20023/15/20023/15/2002APASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/15/2002 9:43:42 AM w/ Cathy W...need reinsp...call contractor to inform. 3/15/2002 11:20:53 AM
BLD-Final12/26/200112/27/200112/27/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/26/2001 at 17:25:24. Contact: ###-####. c/n, int/ext finish...ext rails, eng's stamp on letter of approval 12/27/2001 5:16:28 PM
FIRE-Final Inspection12/27/200112/27/200112/27/2001PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/27/2001 at 11:05:30. Contact: ###-####.
FIRE-Final Inspection12/26/200112/27/200112/27/2001ANR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/26/2001 at 17:23:39. Contact: ###-####.
FIRE-Final Inspection12/26/200112/26/200112/26/2001PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/26/2001 at 07:36:28. Contact: ###-####. need door to corridor with closure and hardware; occupant load sign 12/26/2001 4:56:43 PM
BLD-Final12/21/200112/24/200112/21/2001PCANC
DetailsCarl Dependahl
pending fire & elec insp john ###-#### Disp set to [CANC] by a contractor via Hello! on 12/21/2001 at 18:35:45.
FIRE-Final Inspection12/21/200112/24/200112/21/2001PCANC
DetailsRick Jackson
fire fn ###-#### Disp set to [CANC] by a contractor via Hello! on 12/21/2001 at 18:35:05.
BLD-Conference12/20/200112/21/200112/21/2001APASS
DetailsCarl Dependahl
###-####...w/ arch & bldr...grid ok to chk at final...need eng's statement re shell. 12/21/2001 11:28:01 AM
BLD-Final12/20/200112/21/200112/21/2001PNR
DetailsCarl Dependahl
late late pm ###-####
FIRE-Final Inspection12/19/200112/21/200112/21/2001PNR
DetailsRick Jackson
JIM ###-#### will reschedule 12/21/2001 2:02:00 PM
FIRE-Final Inspection12/19/200112/21/200112/21/2001ACANC
DetailsRick Jackson
JIM ###-####
BLD-Final12/18/200112/19/200112/19/2001ANR
DetailsCarl Dependahl
###-####; nr 12/19/2001 10:32:48 AM
BLD-Framing/Rough-in12/19/200112/19/200112/19/2001APART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/19/2001 10:32:01 AM grid clg, add seismics, met w/ arch. onsite...need eng's letter/ approval for shell bld 01-00917? 12/19/2001 12:12:41 PM
BLD-Framing/Rough-in11/5/200111/6/200111/6/2001APART
DetailsCarl Dependahl
###-####...type 2 exhaust duct chase to be filled w/ insulation, consult w/ Rick J.11/6/2001 12:05:41 PM 11/6/2001 12:06:26 PM
BLD-Framing/Rough-in10/22/200110/23/200110/23/2001APART
DetailsCarl Dependahl
###-#### ok to 1-side at sushi bar & where ok'd by elec; awaiting resubs for potential elec/hvac changes...consult Marv & Dave L. 10/23/2001 5:07:18 PM
BLD-Conference10/18/200110/18/200110/18/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/18/2001 6:06:40 PM ok to shift/extend shaft if equal const used.
BLD-Framing/Rough-in10/15/200110/15/200110/15/2001PPART
DetailsCarl Dependahl
###-####, shaft thru 2nd fl ok; complete firestops at bsmt lid penetrations; need other r/i's for cover. 10/15/2001 3:08:46 PM
BLD-Framing/Rough-in10/1/200110/2/200110/2/2001APART
DetailsCarl Dependahl
###-#### JIM met w/ bldr at site; obtain other r/is...has prior shell permit bld01-00917 w/ no insps??? 10/2/2001 12:20:05 PM
BLD-Framing/Rough-in9/28/200110/1/200110/1/2001APART
DetailsCarl Dependahl
fr jim ###-#### int wall oend elec 10/1/2001 5:03:19 PM