BLD-Aging Inspection | 12/25/2002 | 12/25/2002 | 12/25/2002 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | NR |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 5/23/2002 10:57:19 AM Contractor needs all signatures on occupancy card. 5/23/2002 1:31:35 PM
|
BLD-Final | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/22/2002 at 10:11:50. Contact: ###-####. Cancelled by contractor -re-schedule to pm. 5/23/2002 10:57:53 AM
|
Code Occupancy Approval | | | 5/22/2002 | | PASS |
|
|
|
|
Code Occupancy Approval | | | 4/11/2002 | | FAIL |
|
|
|
LANDSCAPE AND FENCE NOT IN AS REQUIRED, I TOLD CONTRACTOR I COULD SIGN TEMP BUT FINAL COULD NOT BE GIVEN TILL OLD TANK IS REMOVED AS REQUIRED UNDER THE CONDITIONAL USE PERMIT.
|
FIRE-Final Inspection | 4/9/2002 | 4/10/2002 | 4/10/2002 | A | PASS |
Rick Jackson
|
|
|
fire fn rob- ###-####
|
BLD-Concrete | 12/19/2001 | 12/20/2001 | 12/20/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 08:04:29. Contact: . top of tank 12/20/2001 3:58:52 PM
|
BLD-Other | 11/19/2001 | 11/21/2001 | 11/21/2001 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/19/2001 at 13:03:58. Contact: ###-####. no access--road mud--private engineer inspection--talked to contractor --ok to pour. 11/21/2001 2:06:35 PM
|
BLD-Other | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/15/2001 at 14:56:16. Contact: ###-####. Concrete stemwall on section #2 for water tank. 11/16/2001 11:47:06 AM
|
BLD-Foundation | 11/2/2001 | 11/5/2001 | 11/5/2001 | P | PASS |
Steven Webb
|
|
|
###-#### Tank floor not foundation wall 11/5/2001 2:56:03 PM
|
BLD-Other | 10/30/2001 | 10/30/2001 | 10/30/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/30/2001 at 08:32:47. Contact: ###-####. Concrete footing 10/30/2001 2:55:44 PM
|