Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-02190
StatusFinaled
Name UNITED WATER IDAHO (HARRIS RANCH)
Site Address 3250 S COUNCIL SPRING RD
Project Name 
Customer Number 
ePlanReviewNo
Description
HARRIS RANCH WATER TOWER - TO CONSTRUCT A NEW REINFORCED CONCRETE, 355,000 GALLON WATER STORAGE TANK AND RELATED SITE IMPROVEMENTS FOR UNITED WATER IDAHO. THE TANK FLOOR LEVEL WILL BE FROM 9 TO 14 FEET BELOW THE FINISHED GRADE. ALL CONSTRUCTION PER THE APPROVED PLANS. CUP01-00085/PC#666-01/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/25/200212/25/200212/25/2002 PASS
DetailsDave Hannah
BLD-Final5/23/20025/23/20025/23/2002PNR
DetailsSteven Webb
Scheduled by Inspector: 420 On 5/23/2002 10:57:19 AM Contractor needs all signatures on occupancy card. 5/23/2002 1:31:35 PM
BLD-Final5/22/20025/23/20025/23/2002ACANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/22/2002 at 10:11:50. Contact: ###-####. Cancelled by contractor -re-schedule to pm. 5/23/2002 10:57:53 AM
Code Occupancy Approval  5/22/2002 PASS
Code Occupancy Approval  4/11/2002 FAIL
LANDSCAPE AND FENCE NOT IN AS REQUIRED, I TOLD CONTRACTOR I COULD SIGN TEMP BUT FINAL COULD NOT BE GIVEN TILL OLD TANK IS REMOVED AS REQUIRED UNDER THE CONDITIONAL USE PERMIT.
FIRE-Final Inspection4/9/20024/10/20024/10/2002APASS
DetailsRick Jackson
fire fn rob- ###-####
BLD-Concrete12/19/200112/20/200112/20/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/19/2001 at 08:04:29. Contact: . top of tank 12/20/2001 3:58:52 PM
BLD-Other11/19/200111/21/200111/21/2001PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 11/19/2001 at 13:03:58. Contact: ###-####. no access--road mud--private engineer inspection--talked to contractor --ok to pour. 11/21/2001 2:06:35 PM
BLD-Other11/15/200111/16/200111/16/2001APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 11/15/2001 at 14:56:16. Contact: ###-####. Concrete stemwall on section #2 for water tank. 11/16/2001 11:47:06 AM
BLD-Foundation11/2/200111/5/200111/5/2001PPASS
DetailsSteven Webb
###-#### Tank floor not foundation wall 11/5/2001 2:56:03 PM
BLD-Other10/30/200110/30/200110/30/2001PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 10/30/2001 at 08:32:47. Contact: ###-####. Concrete footing 10/30/2001 2:55:44 PM