BLD-Final | 10/18/2002 | 10/18/2002 | 10/18/2002 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 10/14/2002 | 10/14/2002 | 10/14/2002 | P | DONE |
Wm. Michael Meloy
|
|
|
|
Code Occupancy Approval | 10/14/2002 | 10/14/2002 | 10/14/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
Approved 10/14/2002 3:00:01 PM
|
FIRE-Final Inspection | 10/14/2002 | 10/14/2002 | 10/14/2002 | P | PASS |
Rick Jackson
|
|
|
|
FIRE-Conference | 5/8/2002 | 5/9/2002 | 5/9/2002 | A | PART |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 5/8/2002 3:49:48 PM met with Jim Storey and walked through the project; some dampers appear to have the motor too close to wall to have improper fire stopping where motor hits rated wall 5/9/2002 11:01:54 AM
|
FIRE-Conference | 4/26/2002 | 4/26/2002 | 4/26/2002 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 4/26/2002 11:27:33 AM fire sprinklers installed without approved plans; talked to Mike (GC rep for Shilo) and placed stop work on fire sprinklers
|
BLD-Concrete | 4/8/2002 | 4/10/2002 | 4/10/2002 | P | FAIL |
Jim Storey
|
|
|
#5@6pc missing at south end of 2 nd floor runing east west/ blk out and do not place concrete in thi area revise special insp report non compliant. 4/10/2002 4:11:03 PM
|
BLD-Concrete | 4/8/2002 | 4/9/2002 | 4/9/2002 | A | NR |
Jim Storey
|
|
|
pour re-sch. for wed. pm. 4/9/2002 8:41:56 AM
|
BLD-Concrete | 4/8/2002 | 4/9/2002 | 4/9/2002 | P | CANC |
Jim Storey
|
|
|
re-sch for wed.pm. 4/9/2002 8:43:38 AM
|
BLD-Concrete | 4/8/2002 | 4/10/2002 | 4/8/2002 | P | CANC |
Jim Storey
|
|
|
|
BLD-Conference | 4/8/2002 | 4/10/2002 | 4/8/2002 | P | CANC |
Jim Storey
|
|
|
|
BLD-Concrete | 4/8/2002 | 4/8/2002 | 4/8/2002 | P | NR |
Jim Storey
|
|
|
###-#### BRIAN
|
BLD-Framing/Rough-in | 2/13/2002 | 2/13/2002 | 2/13/2002 | P | PART |
Jim Storey
|
|
|
###-#### JEFF (REBAR & CONCRETE) slab on grade ok covered with special insp. pending report. 2/14/2002 9:13:33 AM
|
BLD-Foundation | 2/8/2002 | 2/11/2002 | 2/11/2002 | A | PASS |
Jim Storey
|
|
|
###-####/ 9a.m. rebar ok retaining wall/ pending special insp. report. 2/11/2002 8:40:05 AM
|
BLD-Framing/Rough-in | 2/5/2002 | 2/6/2002 | 2/6/2002 | A | PART |
Jim Storey
|
|
|
###-#### concrete wall and slab on grage wip/ struc. steel wip special insp work rfi for engineering repairs on track. 2/6/2002 11:22:11 AM
|
BLD-Concrete | 1/29/2002 | 2/1/2002 | 2/1/2002 | A | PART |
Jim Storey
|
|
|
###-#### placed wiyh special insp. 2/1/2002 9:39:26 AM
|
BLD-Footing | 1/31/2002 | 2/1/2002 | 2/1/2002 | P | PART |
Jim Storey
|
|
|
###-#### placed w/special insp. 2/1/2002 1:40:56 PM
|
BLD-Concrete | 1/28/2002 | 1/30/2002 | 1/30/2002 | A | PART |
Jim Storey
|
|
|
###-#### or ###-#### Jeff cast in place openings in fab floor bar ok special insp on site pending report. 1/30/2002 10:48:55 AM
|
BLD-Concrete | 1/29/2002 | 1/30/2002 | 1/30/2002 | P | PART |
Jim Storey
|
|
|
###-#### retaining wall footing
|
BLD-Concrete | 12/12/2001 | 12/13/2001 | 12/13/2001 | A | PART |
Jim Storey
|
|
|
###-#### pending special insp. report. 12/13/2001 3:19:59 PM
|
BLD-Concrete | 10/31/2001 | 11/2/2001 | 11/2/2001 | P | PART |
Russ Owen
|
|
|
nate ###-####. Special inspection will be performed for this pour. 11/2/2001 12:24:17 PM
|
BLD-Concrete | 10/31/2001 | 10/31/2001 | 10/31/2001 | P | PART |
Dave Hannah
|
|
|
###-#### nate spec inspection by mti crew placing key way 10/31/2001 3:23:45 PM
|