BLD-Final | 7/1/2002 | 7/2/2002 | 7/2/2002 | A | PASS |
Jim Storey
|
|
|
###-#### JON c/n made ok in pharmacy.final ok 7/2/2002 10:09:29 AM
|
Permanent Occupancy | | 7/2/2002 | 7/2/2002 | | DONE |
|
|
|
|
BLD-Final | 5/28/2002 | 5/29/2002 | 5/29/2002 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 14:23:35. Contact: ###-####. temp ok need mti and engineer to sign off on low prism breaks / state pharmcy law need justafacation to locking hardware on egrees doors out of pharmcy 5/29/2002 3:47:45 PM
|
FIRE-Final Inspection | 5/28/2002 | 5/29/2002 | 5/29/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/28/2002 at 09:12:39. Contact: ###-####.
|
Code Occupancy Approval | 5/28/2002 | 5/28/2002 | 5/28/2002 | A | PASS |
Wm. Michael Meloy
|
|
|
|
FIRE-Final Inspection | 5/21/2002 | 5/22/2002 | 5/22/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/21/2002 at 07:29:09. Contact: ###-####. key locks at main exit; fire alarm phone line problems 5/22/2002 9:14:11 AM
|
FIRE-Hydro test above ground | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | FAIL |
Troy Cobbley
|
|
|
unable to perform hydro test due to faulty valve, unerground flush ok 5/1/2002 2:47:22 PM
|
BLD-Other | 4/29/2002 | 4/30/2002 | 4/30/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/29/2002 at 14:15:07. Contact: ###-####. c/n made ok ok to drop ceilling pending fire insp. 4/30/2002 10:06:43 AM
|
FIRE-Hydro test above ground | 4/29/2002 | 4/30/2002 | 4/30/2002 | P | PART |
Troy Cobbley
|
|
|
Hydro test not done. I did a rough-in inspection on the 1 hour photo, pharmacy and the drive thru canopy. Sprinkler contractor to add one hanger in canopy and change out one pendant in 1 hour photo and pharmacy to ECOH type 4/30/2002 11:33:15 AM
|
BLD-Framing/Rough-in | 4/25/2002 | 4/26/2002 | 4/26/2002 | A | PART |
Steven Webb
|
|
|
###-#### Suspended ceiling--ok to drop tiles in main area--verify spacer bars are installed prior to final. 4/26/2002 10:27:55 AM
|
FIRE-Conference | 4/23/2002 | 4/24/2002 | 4/24/2002 | A | NH |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 10:33:35. Contact: ###-####. GC not here 4/24/2002 9:03:29 AM
|
FIRE-Conference | 4/24/2002 | 4/24/2002 | 4/24/2002 | P | PART |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 4/24/2002 9:03:08 AM requirements for final with GC; sprinklers required at areas above ceiling in sales areas for combustible catwalk 4/24/2002 3:46:38 PM
|
BLD-Framing/Rough-in | 3/28/2002 | 3/29/2002 | 3/29/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/28/2002 at 11:54:22. Contact: ###-####. c/n made ok. 3/29/2002 9:26:07 AM
|
BLD-Framing/Rough-in | 3/27/2002 | 3/28/2002 | 3/28/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/27/2002 at 15:32:09. Contact: ###-####. Interior non-bearing walls--studs need screws on both sides not just one. 3/28/2002 11:42:55 AM
|
BLD-Other | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 09:09:34. Contact: ###-####. roof decking welding left note for special inspector to check several areas no respection as long as sp insp signs off 3/5/2002 1:22:28 PM
|
BLD-Footing | 12/26/2001 | 12/27/2001 | 12/27/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/26/2001 at 15:10:28. Contact: ###-####. rfi from engineer for rebar configuration changed from approved plan verbal ok from hinsman and jones pending hard copy. special insp. on site ok. 12/27/2001 9:16:32 AM
|
BLD-Footing | 12/18/2001 | 12/19/2001 | 12/19/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/18/2001 at 13:08:57. Contact: ###-####. ok inspection by mti 12/19/2001 12:00:06 PM
|
BLD-Footing | 12/14/2001 | 12/17/2001 | 12/17/2001 | A | PASS |
Jim Storey
|
|
|
###-#### ft ok mti report pending. 12/17/2001 9:27:10 AM
|