BLD-Aging Inspection | 11/5/2003 | 11/5/2003 | 11/5/2003 | | DONE |
Dave Hannah
|
|
|
|
BLD-Footing | 7/9/2003 | 7/10/2003 | 7/10/2003 | A | CANC |
Carl Dependahl
|
|
|
garage/carport ftgs...added in error 7/9/2003 2:07:21 PM
|
BLD-Conference | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 10:05:11. Contact: ###-####. w/ Larry Hansen...may need permit for art work supports near escalator. Consult plans review. 3/1/2002 5:08:25 PM
|
BLD-Aging Inspection | 1/8/2002 | 1/8/2002 | 1/8/2002 | | NR |
Carl Dependahl
|
|
|
Cap.Terrace escalator, called Larry H, left msg to get final, need spec insp reports. 1/11/2002 11:39:31 AM
|
BLD-Conference | 11/8/2001 | 11/8/2001 | 11/8/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/8/2001 9:43:35 AM rec'd revised ftg eng'g; awaiting spec insp reports for welds, fireproofing.
|
BLD-Framing/Rough-in | 10/26/2001 | 10/26/2001 | 10/26/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/26/2001 at 10:07:38. Contact: ###-####....frame c/n ok pending spec insp reports for welds/fireproofing. 10/26/2001 1:58:46 PM
|
BLD-Conference | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/23/2001 5:40:56 PM w/ Larry H & contractor re spec insp...keep c/n re guardrails.
|
BLD-Framing/Rough-in | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/22/2001 at 09:19:12. Contact: ###-####....need plans; insp reports 10/22/2001 3:31:14 PM
|
BLD-Conference | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/19/2001 2:00:33 PM w/ Larry Hanson...has spec insp reports for fireproofing & welds
|
BLD-Framing/Rough-in | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/19/2001 at 08:53:38. Contact: ###-####...awaiting spec insp reports from Strata 10/19/2001 2:21:23 PM
|
BLD-Other | 10/9/2001 | 10/10/2001 | 10/10/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 15:17:53. Contact: ###-####...met onsite, header beam is secondary & doesn't req complete 3hr protection. 10/10/2001 2:08:43 PM
|
BLD-Conference | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/9/2001 2:37:00 PM keep c/n, rec'd resubmittal, need clarify prop. lines or right -of-way.
|
BLD-Footing | 9/26/2001 | 9/27/2001 | 9/27/2001 | A | FAIL |
Carl Dependahl
|
|
|
larry ###-#### c/n issued, pour at own risk; verify ACHD ok for work at sidewalk/public way. ftg steel appears ok per plans. spec insp reqd for struct frame & fireproofing. 9/27/2001 11:28:28 AM
|
BLD-Foundation | 9/27/2001 | 9/27/2001 | 9/27/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### proceed at own risk pending letter fromm CCDC or ACHD re sidewalks; keep c/n 9/27/2001 2:49:54 PM
|