BLD-Final | 5/20/2002 | 5/20/2002 | 5/20/2002 | P | PASS |
Jim Sly
|
|
|
fn insp- todd- ###-#### OK for _erm Occ. 5/20/2002 1:38:57 PM
|
BLD-Final | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | NR |
Dave Hannah
|
|
|
fn occ todd- ###-#### still needs other sign offs 4/22/2002 1:41:02 PM
|
FIRE-Final Inspection | 4/18/2002 | 4/18/2002 | 4/18/2002 | P | PASS |
Troy Cobbley
|
|
|
Life safety OK. Structural to verify sticker over exit door and lever on other exit door
|
BLD-Energy code compliance | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 08:49:09. Contact: ###-####. ti ok 3/12/2002 1:49:34 PM
|
BLD-Framing/Rough-in | 3/7/2002 | 3/8/2002 | 3/8/2002 | A | PASS |
Jim Sly
|
|
|
###-#### TODD
|
BLD-Framing/Rough-in | 3/7/2002 | 3/7/2002 | 3/7/2002 | P | PART |
Jim Sly
|
|
|
todd- shear wall --###-#### Shear OK 3/7/2002 4:45:08 PM
|
BLD-Framing/Rough-in | 2/20/2002 | 2/20/2002 | 2/20/2002 | P | PART |
Jim Sly
|
|
|
SHEER WALL ###-#### TODD East shear wall and exterior type X rock.....OK. 2/20/2002 3:29:50 PM
|
BLD-Aging Inspection | 1/30/2002 | 1/30/2002 | 1/30/2002 | | PART |
Jim Sly
|
|
|
WIP 1/30/2002 9:29:48 AM
|
BLD-Footing | 11/29/2001 | 11/30/2001 | 11/30/2001 | A | PASS |
Jim Sly
|
|
|
BOB ###-####
|