Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-02451
StatusFinaled
Name SHILOH DEVELOPMENT LTD CO
Site Address 3846 -48 E PECAN ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 3395 sq. ft. two story DUPLEX (1378 sq. ft. first floor/1413 sq. ft. second floor) (604 sq. ft. second unit) with a 1005 sq. ft. finished basement, 1035 sq. ft. three car garage and a 254 sq. ft. covered front porch. Per approved plans, engineering, requirement list and all items from CAA01-00249 per Susan Riggs with Planning and Zoning. PC#646 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/4/20023/5/20023/5/2002APASS
DetailsSteven Webb
8###-#### code 7550 troy ###-#### c. of c. #22165 issued. 3/5/2002 8:37:08 AM
BLD-Energy code compliance12/20/200112/21/200112/21/2001APASS
DetailsSteven Webb
###-#### ok to cover 12/21/2001 8:49:26 AM
BLD-Framing/Rough-in12/18/200112/19/200112/19/2001APART
DetailsSteven Webb
###-#### randy sheer wall as well-c/n--ok to side upstairs and to insulate, draftstops needed at fir out walls in basement. 12/19/2001 10:44:00 AM
BLD-Framing/Rough-in12/17/200112/17/200112/17/2001PPART
DetailsSteven Webb
###-#### SHEAR-NOT FRAMING--ok to side downstairs only but re-inspection needed on up stairs shear 12/17/2001 2:13:13 PM
BLD-Framing/Rough-in12/13/200112/14/200112/14/2001AFAIL
DetailsSteven Webb
###-#### SHEAR-DO NOT COVER 12/14/2001 9:36:57 AM
BLD-Framing/Rough-in12/12/200112/13/200112/13/2001AFAIL
DetailsJim Storey
SHEER WALL TROY ###-#### no plans on site no work done. 12/13/2001 10:32:57 AM
BLD-Framing/Rough-in12/11/200112/11/200112/11/2001PFAIL
DetailsSteven Webb
RANDY ###-#### SHEER WALL--no approved plans on site--re-call for inspection. 12/11/2001 2:45:48 PM
BLD-Framing/Rough-in11/29/200112/3/200112/3/2001AFAIL
DetailsSteven Webb
###-#### c/n issued--many items need attention prior to next inspection--do not cover--SHEAR NOT FRAMING 12/3/2001 10:41:26 AM
BLD-Concrete10/18/200110/18/200110/18/2001PPART
DetailsSteven Webb
###-#### MIKE SSTB anchor bolts tie in place, 75% of walls completed--no interior footings will be poured under slab in the basement at this time--this will be done at the flat work. 10/18/2001 2:43:11 PM
BLD-Footing10/15/200110/15/200110/15/2001PPART
DetailsRuss Owen
###-#### chris. appears ok no re-inforcement in at this time. 10/15/2001 1:33:26 PM