BLD-Aging Inspection | 12/5/2001 | 12/5/2001 | 12/5/2001 | | PART |
Russ Owen
|
|
|
wip. 12/7/2001 4:38:26 PM
|
BLD-Conference | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 10/2/2001 3:37:46 PM went out with plan checker to check design of movable rolling storage racks.
|
BLD-Final | 9/27/2001 | 9/28/2001 | 9/28/2001 | A | FAIL |
Russ Owen
|
|
|
fn ??sue ###-#### . need to clarify the attachement of the (5) fixed shelves to the concrete,appears to call out 5/16 bolts now has 1/4 bolts which are attached 9/28/2001 12:51:50 PM to to bottom cross rail not the end column. also needs fire/life safety c/n posted. 9/28/2001 12:52:34 PM
|
BLD-Final | 9/28/2001 | 9/28/2001 | 9/28/2001 | P | FAIL |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 9/28/2001 2:02:52 PM . Recieved call back from plan reveiw, that i made while at the site, All Racking was to be bolted to floor, As engineer had told plan revew, these were stationary not rolling racking, these racks do roll as decribed by the floor plan. There is no means over providing over turn protection to these racks, I have called the architect and left a voice message to retun my call , John Maning at ###-####. This correction of bolting with 5/16 in bolts applys to all racks. No just the stationary racks c/n for all racks. 9/28/2001 2:18:08 PM
|