Description
To construct a 3892 sq. ft. two story single family dwelling with a 2763 sq. ft. unfinished basement, a 951 sq. ft. attached three car garage, a 72 sq. ft. covered entry way and 175 sq. ft. of covered concrete patio areas at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. NOTE: Seperate permits will be required to finish basement. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and defensible area will be maintained. (1st floor 2763 sq. ft.)(2nd floor 1129 sq. ft.) PC #665 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/5/20026/6/20026/6/2002APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 06/05/2002 at 16:45:54. Contact: ###-####.
BLD-Grading Inspection6/5/20026/5/20026/5/2002 PASS
DetailsRita DeYoung
Final grading and drainage complete and approved.
BLD-Energy code compliance2/26/20022/27/20022/27/2002APART
DetailsCarl Dependahl
###-####; ok to cover, walls ok. 2/27/2002 11:14:08 AM
BLD-Framing/Rough-in2/21/20022/21/20022/21/2002PPASS
DetailsTom Arcoraci
bryon ###-#### fr
BLD-Framing/Rough-in2/19/20022/20/20022/20/2002ANR
DetailsDave Hannah
Scheduled by Inspector: 408 On 2/19/2002 4:35:54 PM no plans or truss eng on site talked with framer he will get them and reschedule for tomorrow 2/20/2002 3:21:54 PM
BLD-Framing/Rough-in2/19/20022/19/20022/19/2002PCANC
DetailsTom Arcoraci
###-#### JOHN no time 2/19/2002 4:41:55 PM
BLD-Framing/Rough-in1/24/20021/24/20021/24/2002PPART
DetailsTony Young
###-#### shear nailing
ext. shear ok on hackberry house, not tiverton, bp #s and addresses messed up between johns 2 houses 1/24/2002 2:01:58 PM
BLD-Framing/Rough-in1/17/20021/17/20021/17/2002PFAIL
DetailsDave Hannah
###-#### shear nailing HD hold downs not bolted down in walls panels not nailed per plans 1/17/2002 2:41:10 PM
BLD-Aging Inspection1/16/20021/16/20021/16/2002 PART
DetailsTony Young
wip 1/16/2002 9:54:15 AM
BLD-Concrete11/15/200111/16/200111/16/2001PPART
DetailsTony Young
###-#### JOHN
interior ftgs in basement, wip 11/16/2001 2:40:52 PM
BLD-Foundation10/31/200110/31/200110/31/2001PPART
DetailsTony Young
###-#### STEVE
ok for walls 10/31/2001 2:40:00 PM
BLD-Foundation10/24/200110/25/200110/25/2001APART
DetailsTony Young
###-#### steve
basement wall steel, ok so far, starting to stand panels 10/25/2001 10:32:31 AM
BLD-Footing10/17/200110/19/200110/19/2001APART
DetailsTony Young
###-#### STEVE
BLD-Grading Inspection10/19/200110/19/200110/19/2001 PASS
DetailsRita DeYoung
Geotechnical engineer has approved foundation subgrade.
BLD-Conference10/17/200110/18/200110/18/2001APART
DetailsTony Young
steve ###-####
conf. on ftgs, engineering, soils, etc. ///need clarification from structural eng. on which drawing to use for basment wall 10/18/2001 10:15:48 AM