BLD-Final | 4/14/2002 | 4/15/2002 | 4/15/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/14/2002 at 17:27:17. Contact: ###-####.final ok pending others sign off. 4/15/2002 11:13:01 AM
|
BLD-Final | 4/11/2002 | 4/12/2002 | 4/12/2002 | A | NR |
Jim Storey
|
|
|
TEMP OCC ###-#### need fire doors 4/12/2002 4:19:43 PM
|
BLD-Final | 4/9/2002 | 4/10/2002 | 4/10/2002 | P | NR |
Jim Storey
|
|
|
temp occ- richard -###-####
|
FIRE-Final Inspection | 4/9/2002 | 4/10/2002 | 4/10/2002 | P | PASS |
Rick Jackson
|
|
|
###-#### RICHARD will have address up for structural inspector 4/10/2002 2:40:45 PM
|
BLD-Framing/Rough-in | 2/20/2002 | 2/20/2002 | 2/20/2002 | P | PASS |
Jim Storey
|
|
|
###-#### RICHARD DIVIDING WALLS AT CEILING IN RESTROOMS ok 2/20/2002 4:46:55 PM
|
BLD-Framing/Rough-in | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | PASS |
Jim Storey
|
|
|
###-#### (FOR SHELL) ok 1/31/2002 2:51:11 PM
|
BLD-Framing/Rough-in | 1/31/2002 | 1/31/2002 | 1/31/2002 | P | PASS |
Jim Storey
|
|
|
###-#### (FOR SHELL) ok 1/31/2002 2:51:11 PM
|
BLD-Framing/Rough-in | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PART |
Jim Storey
|
|
|
DAN ###-#### ok to insulate walls exterior need top plate straps on south entry. 1/28/2002 4:58:12 PM
|
BLD-Framing/Rough-in | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PART |
Jim Storey
|
|
|
DAN ###-#### ok to insulate walls exterior need top plate straps on south entry. 1/28/2002 4:58:12 PM
|
BLD-Framing/Rough-in | 1/11/2002 | 1/14/2002 | 1/14/2002 | P | PART |
Jim Storey
|
|
|
TRUSS\\###-#### sheer nailling ok for exterior cover. 1/14/2002 3:30:43 PM
|
BLD-Concrete | 12/6/2001 | 12/7/2001 | 12/7/2001 | A | PASS |
Jim Storey
|
|
|
###-#### c/n made ok. 12/7/2001 10:45:46 AM
|
BLD-Foundation | 12/6/2001 | 12/6/2001 | 12/6/2001 | P | FAIL |
Russ Owen
|
|
|
###-#### c/n posted .clearance and bent verticals into the walls. 12/6/2001 4:03:40 PM
|
BLD-Footing | 12/3/2001 | 12/4/2001 | 12/4/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### LAZARO
|