BLD-Grading Inspection | 12/15/2003 | 12/15/2003 | 12/15/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading approved and bond released.
|
BLD-Conference | 11/12/2002 | 11/12/2002 | 11/12/2002 | P | PASS |
Dave Hannah
|
|
|
PLEASE DOC FINAL THIS PERMIT
|
BLD-Final | 4/24/2002 | 4/25/2002 | 4/25/2002 | A | PASS |
Tony Young
|
|
|
###-####
|
BLD-Final | 4/25/2002 | 4/25/2002 | 4/25/2002 | P | PASS |
Tony Young
|
|
|
CHAD ###-#### 4/25/2002 10:58:54 AM
bond in place per Cathy W., hillside ok per T. Records 4/25/2002 4:00:57 PM
|
BLD-Grading Inspection | 4/25/2002 | 4/25/2002 | 4/25/2002 | | BOND |
Rita DeYoung
|
|
|
Grading has not been completed according to the approved plan. Substantial changes have been made which may not be able to be approved because a maximum of 3 feet of fill is allowed in this subdivision. A revised grading plan must be submitted for review. Also, downspouts, connection of roof drains to the stormdrain, and revegetation of this lot and the lots on either side must be completed. A $3000.00 bond is required.
|
BLD-Conference | 4/22/2002 | 4/23/2002 | 4/23/2002 | A | PART |
Tony Young
|
|
|
FOR CONF CHAD ###-####
conf. on final 4/23/2002 10:54:04 AM
|
BLD-Energy code compliance | 2/11/2002 | 2/11/2002 | 2/11/2002 | A | PASS |
Tony Young
|
|
|
2/11/2002 8:19:48 AM
|
BLD-Energy code compliance | 2/7/2002 | 2/8/2002 | 2/8/2002 | P | NR |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/7/2002 | 2/8/2002 | 2/8/2002 | A | PART |
Tony Young
|
|
|
###-####
need truss specs, need to verify draft stops in basement ceiling after insulation, ext. shear ok, ok to insulate after plumbing pass 2/8/2002 1:17:26 PM
|
BLD-Framing/Rough-in | 2/5/2002 | 2/7/2002 | 2/7/2002 | A | FAIL |
Tony Young
|
|
|
CHAD ###-####
conf. only on framing and fp mantel 2/7/2002 12:53:04 PM
|
BLD-Grading Inspection | 12/27/2001 | 12/27/2001 | 12/27/2001 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade beneath garage and front entrance has been approved by the geotechnical engineer.
|
BLD-Footing | 12/20/2001 | 12/21/2001 | 12/21/2001 | A | PART |
Tony Young
|
|
|
###-####
porch and garage ftgs, forms part way up, no rebar yet 12/21/2001 4:33:33 PM
|
BLD-Footing | 12/19/2001 | 12/20/2001 | 12/20/2001 | P | NR |
Tony Young
|
|
|
ft insp chad- ###-####
|
BLD-Footing | 11/19/2001 | 11/21/2001 | 11/21/2001 | A | PART |
Tony Young
|
|
|
###-#### CHAD
|
BLD-Footing | 11/16/2001 | 11/19/2001 | 11/19/2001 | A | NR |
Tony Young
|
|
|
###-####
|
BLD-Foundation | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | PART |
Jim Storey
|
|
|
wall insp-- ###-####- chad pwoi 11/14/2001 5:04:07 PM
|
BLD-Footing | 11/2/2001 | 11/5/2001 | 11/5/2001 | P | PART |
Steven Webb
|
|
|
###-#### CHAD wip--appears ok 11/5/2001 3:55:15 PM
|
BLD-Footing | 11/1/2001 | 11/2/2001 | 11/2/2001 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 17:38:04. Contact: .
|
BLD-Grading Inspection | 11/1/2001 | 11/1/2001 | 11/1/2001 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer has approved the foundation subgrade.
|