To construct a 2791 sq. ft. single story, single family dwelling with a 2646 sq. ft. UNFINISHED basement, a attached 966 sq. ft. three car garage, a 610 sq. ft. patio off the basement floor, a 610 sq. ft. deck off the first floor, and a 183 sq. ft. covered front porch. Per approved plans, engineering, all red-lining and requirement list. This lot is within the hillside area and it subject to the hillside ordinances. Class "A" roof system and defensible area will be required. PC#661 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Grading Inspection12/15/200312/15/200312/15/2003 PASS
DetailsRita DeYoung
Final grading approved and bond released.
BLD-Conference11/12/200211/12/200211/12/2002PPASS
DetailsDave Hannah
PLEASE DOC FINAL THIS PERMIT
BLD-Final4/24/20024/25/20024/25/2002APASS
DetailsTony Young
###-####
BLD-Final4/25/20024/25/20024/25/2002PPASS
DetailsTony Young
CHAD ###-#### 4/25/2002 10:58:54 AM
bond in place per Cathy W., hillside ok per T. Records 4/25/2002 4:00:57 PM
BLD-Grading Inspection4/25/20024/25/20024/25/2002 BOND
DetailsRita DeYoung
Grading has not been completed according to the approved plan. Substantial changes have been made which may not be able to be approved because a maximum of 3 feet of fill is allowed in this subdivision. A revised grading plan must be submitted for review. Also, downspouts, connection of roof drains to the stormdrain, and revegetation of this lot and the lots on either side must be completed. A $3000.00 bond is required.
BLD-Conference4/22/20024/23/20024/23/2002APART
DetailsTony Young
FOR CONF CHAD ###-####
conf. on final 4/23/2002 10:54:04 AM
BLD-Energy code compliance2/11/20022/11/20022/11/2002APASS
DetailsTony Young
2/11/2002 8:19:48 AM
BLD-Energy code compliance2/7/20022/8/20022/8/2002PNR
DetailsTony Young
###-####
BLD-Framing/Rough-in2/7/20022/8/20022/8/2002APART
DetailsTony Young
###-####
need truss specs, need to verify draft stops in basement ceiling after insulation, ext. shear ok, ok to insulate after plumbing pass 2/8/2002 1:17:26 PM
BLD-Framing/Rough-in2/5/20022/7/20022/7/2002AFAIL
DetailsTony Young
CHAD ###-####
conf. only on framing and fp mantel 2/7/2002 12:53:04 PM
BLD-Grading Inspection12/27/200112/27/200112/27/2001 PASS
DetailsRita DeYoung
Footing subgrade beneath garage and front entrance has been approved by the geotechnical engineer.
BLD-Footing12/20/200112/21/200112/21/2001APART
DetailsTony Young
###-####
porch and garage ftgs, forms part way up, no rebar yet 12/21/2001 4:33:33 PM
BLD-Footing12/19/200112/20/200112/20/2001PNR
DetailsTony Young
ft insp chad- ###-####
BLD-Footing11/19/200111/21/200111/21/2001APART
DetailsTony Young
###-#### CHAD
BLD-Footing11/16/200111/19/200111/19/2001ANR
DetailsTony Young
###-####
BLD-Foundation11/13/200111/13/200111/13/2001PPART
DetailsJim Storey
wall insp-- ###-####- chad pwoi 11/14/2001 5:04:07 PM
BLD-Footing11/2/200111/5/200111/5/2001PPART
DetailsSteven Webb
###-#### CHAD wip--appears ok 11/5/2001 3:55:15 PM
BLD-Footing11/1/200111/2/200111/2/2001PCANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 11/01/2001 at 17:38:04. Contact: .
BLD-Grading Inspection11/1/200111/1/200111/1/2001 PASS
DetailsRita DeYoung
Geotechnical engineer has approved the foundation subgrade.