Permanent Occupancy | | 11/22/2002 | 11/22/2002 | | DONE |
|
|
|
|
BLD-Final | 10/24/2002 | 10/25/2002 | 10/25/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 18:46:20. Contact: ###-####.
|
BLD-Final | 10/8/2002 | 10/9/2002 | 10/9/2002 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/08/2002 at 11:42:23. Contact: ###-####...need verify fire, P&Z... 10/9/02 10:03:27 AM
|
BLD-Final | 10/9/2002 | 10/9/2002 | 10/9/2002 | P | FAIL |
Carl Dependahl
|
|
|
greg 8631508...still needs other sigs: ACHD, PWks, P&Z...replace entry hdwe w/ lever 10/9/02 4:11:04 PM
|
FIRE-Final Inspection | 10/9/2002 | 10/9/2002 | 10/9/2002 | P | PASS |
Rick Jackson
|
|
|
|
FIRE-Supply Line Hydro | 10/7/2002 | 10/8/2002 | 10/8/2002 | A | PASS |
Rick Jackson
|
|
|
greg call first ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie will have lever set on restroom door for structural; accessible route to access the ramp on east side of house is not installed per plans; path not 4 foot wide for wheelchair use 10/8/2002 10:54:13 AM
|
BLD-Final | 9/30/2002 | 10/2/2002 | 10/2/2002 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/30/2002 at 13:12:04. Contact: ###-####....need fire, card, add front hand rails, recall. 10/2/2002 12:06:05 PM
|
BLD-Grading Inspection | 9/3/2002 | 9/3/2002 | 9/3/2002 | P | NR |
Rita DeYoung
|
|
|
PARKING LOT; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung; referred to pub wks for drainage insp. 9/3/2002 3:59:02 PM
|
BLD-Framing/Rough-in | 4/8/2002 | 4/8/2002 | 4/8/2002 | P | PASS |
Carl Dependahl
|
|
|
###-#### GREG KEY UNDER ROCK AT BACK DOOR c/n ok 4/8/2002 4:09:50 PM
|
BLD-Framing/Rough-in | 3/11/2002 | 3/12/2002 | 3/12/2002 | A | FAIL |
Carl Dependahl
|
|
|
GREG ###-#### KEY IS UNDER ROCK BY THE BACK DOOR PLANS ARE ON KITCHEN COUNTER; nr, need elec, c/n issued, framing not complete (ramp? bsmt /crawl doors..etc. see c/n) 3/12/2002 10:28:14 AM
|