BLD-Final | 10/11/2002 | 10/14/2002 | 10/14/2002 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
ok for perm. occ. 10/14/2002 10:42:30 AM
|
Permanent Occupancy | | 10/14/2002 | 10/14/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/11/2002 | 10/11/2002 | 10/11/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled
|
FIRE-Final Inspection | 10/10/2002 | 10/10/2002 | 10/10/2002 | A | FAIL |
Troy Cobbley
|
|
|
provide panic hardware per the building review notes on the main exit door from the day care
|
BLD-Final | 9/23/2002 | 9/25/2002 | 9/25/2002 | A | NR |
Russ Owen
|
|
|
Cathy has the card. This is not ready as I can see fire/life/safety has not approved ? no contact number. 9/25/2002 9:40:13 AM
|
FIRE-Final Inspection | 9/23/2002 | 9/24/2002 | 9/24/2002 | P | FAIL |
Troy Cobbley
|
|
|
no approved plans on site. I did not inspect project 9/24/2002 3:16:30 PM
|
BLD-Conference | 6/13/2002 | 6/13/2002 | 6/13/2002 | | DONE |
|
|
|
Conference - ok for temp. occ. - Carl
|
BLD-Final | 6/12/2002 | 6/13/2002 | 6/13/2002 | A | PART |
Carl Dependahl
|
|
|
TEMP OCC ###-####- BUTCH ...ok for t/o; fire alarms on temp...struct c/n ok. 6/13/2002 11:41:27 AM
|
BLD-Final | 6/11/2002 | 6/12/2002 | 6/12/2002 | A | FAIL |
Jim Sly
|
|
|
###-#### butch call 1st please C/N Need Occ request card. 6/12/2002 11:22:12 AM
|
FIRE-Final Inspection | 6/11/2002 | 6/12/2002 | 6/12/2002 | A | PART |
Troy Cobbley
|
|
|
I signed a temp for the fire alarm and fire life safety per Dave Millers ok 6/12/2002 10:49:35 AM
|
BLD-Final | 4/23/2002 | 4/23/2002 | 4/23/2002 | P | NR |
Dave Hannah
|
|
|
fn insp butch ###-####
|
BLD-Framing/Rough-in | 4/23/2002 | 4/23/2002 | 4/23/2002 | P | PART |
Dave Hannah
|
|
|
Added by Inspector: 425 On 4/23/2002 1:45:49 PM 1hr wall second floor up to bottom of roof ok ceiling grid ok to place tiles
|
BLD-Framing/Rough-in | 4/11/2002 | 4/11/2002 | 4/11/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### call butch first before you go., 2hr wall & clg assy ok; add gyp at top of 1hr sep. wall ( 2nd fl.) remove plastic exhaust duct ( Cl 0 or 1 req'd) return handrails 4/11/2002 5:45:39 PM
|
BLD-Framing/Rough-in | 3/27/2002 | 3/28/2002 | 3/28/2002 | A | CANC |
Jim Sly
|
|
|
###-#### BURT Picked up by 340. 3/28/2002 11:36:05 AM
|